Cabinetry & Millwork Estimating Services
Cabinetry and millwork estimating services price casework made in a shop, then delivered and installed, so labor is two numbers at two rates. Our services split shop hours from field hours on separate lines. The estimate returns in 18 to 24 hours at 97% accuracy, tracked. Pricing is $100 to $5,000, flat fee per project, set by scope. Reply within 20 minutes during working hours.
- Shop fabrication and field install on their own lines
- The AWI grade we priced to, written on the estimate
- A millwork estimator answers in 20 min
Elevations in, priced package out
Accuracy, tracked
Shop hours and field hours, never blended
Reply from a millwork estimator
Cabinets Off a Shelf, Woodwork Off a Drawing
Two kinds of work sit inside this trade, and each one is priced on a different basis. Casework is factory-built: standard carcasses, doors, drawer boxes, shelves, made to catalog sizes and assembled on site. Millwork is the made-to-order half: architectural woodwork cut to a drawing that exists only for your job, with each profile, joinery detail and finish specified item by item. Reception desks, paneled walls, library shelving, a curved bar front. Both land on one takeoff, along with the trim, the countertops, and the hardware that hangs it all.
The spec book calls this architectural woodwork, CSI Division 06 40 00, and factory casework also appears under Division 12 where the spec places it there. We price both.
One boundary. We estimate, we don't fabricate and we don't sell you cabinets, so this isn't a shop quote and it isn't a supplier list. It's the number you need to bid the package or check the one you've been handed. Master Estimating works with millwork and casework subcontractors, woodwork shops bidding architectural jobs, and general contractors pricing an interior fit-out.
Most of This Trade Happens in a Shop
Millwork is manufactured in a shop before it ever reaches the site. That single fact splits its labor into two numbers instead of one.
Framing gets framed on site. Drywall gets hung on site. Millwork gets manufactured, in a shop, weeks before anyone carries it through the door. Sheet goods get cut, edges get banded, joinery gets machined, doors get fitted, and the whole thing gets finished and wrapped before it goes on a truck. Only then does the install crew show up.
So you're pricing two labor pools, not one.
Shop hours
Shop hours cover fabrication and finishing, and they run at a shop rate against a shop schedule.
Field hours
Field hours cover delivery, setting, scribing to walls that are never quite plumb, and final adjustment, at a different rate on the site's schedule.
Bundle them into a single labor line and you've hidden the half of the job that's easiest to get wrong.
There's a third thing sitting between them, and it costs money too: shop machinery time, finishing, crating and delivery. We price that as its own line.
Grade Decides What the Shop Has to Build
The Architectural Woodwork Standards, published by AWI and the Woodwork Institute, set three quality grades, and the one your spec names changes what the shop is actually obliged to produce.
Economy
The baseline. Looser tolerances, simpler joinery, fewer requirements on how materials are matched.
Custom
The most commonly specified grade, and the one most commercial fit-outs assume by default.
Premium
Tightest tolerances, best material grades, strictest requirements for veneer matching and finish quality.
Same cabinet run, same linear footage, three genuinely different prices, because the grade drives material selection, joinery method, tolerance and finish. And when the spec doesn't state a grade at all, that's an assumption someone is going to make silently. We make it out loud, on the estimate, so the assumption is visible and open to correction.
Worth being clear this isn't the same idea as a drywall finish level. A finish level governs what a crew does on site after the board is up. A woodwork grade governs what the shop builds before anything reaches the site at all.
Drawing, Shop, Truck, Wall
Millwork moves through four stages, and the estimate has to anticipate all of them from drawings that are not yet final.
The bid drawings
Interior elevations, sections, and the millwork spec. We take off from these, and they're rarely the last word.
Shop drawings
Produced after award, by the shop, for approval. They resolve everything the bid drawings left open. A good bid anticipates what they'll show.
Fabrication and finish
Cutting, banding, machining, assembly, finishing, crating. Shop hours, shop rate.
Delivery and install
Onto a truck, into the building, set, scribed and adjusted. Field hours, field rate.
We flag anything in the bid set left open until shop-drawing stage, so the gap between what you bid and what you build is a known quantity instead of a change order.
Shop Hours and Field Hours, on Separate Lines
The lines you get back are split the way the work actually divides.
Casework
Counted by unit and by bank, sorted by type and size, base cabinets and uppers subtotalled separately.
Custom millwork
Quantified against the elevations, item by item, with the profile and joinery noted.
Trim and moldings
Base, crown, casing and chair rail by the linear foot, by profile.
Paneling and countertops
By area, with the material, edge detail and any veneer matching requirement stated.
Cabinet hardware
Hinges, pulls, drawer slides, locks and shelf supports, counted and specified.
Shop labor
Fabrication and finishing hours, at shop rate.
Field labor
Delivery, setting and adjustment hours, at field rate.
Cost summary
One total at the bottom, with waste and delivery already inside it.
The AWI grade we priced to is written on the estimate. So is anything the drawings left ambiguous.
A Bank Lobby and a Broom Closet
Millwork covers an enormous range within one trade. A house needs a kitchen, some vanities and a run of trim. An office fit-out needs reception casework, meeting-room paneling and a coffee point. A plant or a warehouse needs workbenches and tool storage built to survive being knocked about. A school or a civic building needs hundreds of near-identical units that still have to look like joinery.

Kitchens, vanities and trim, from a single shop for the whole house.

Reception desks and paneling, where the visible pieces carry the specification.

Workbenches and storage, specified for durability.

Shelving runs and classroom casework, bid against a spec nobody gets to interpret loosely.
Nobody Owns This Scope End to End
Millwork gets specified by one party, bought by another and built by a third, which is exactly why the number gets argued over.
Millwork and casework subcontractors
Send us the set to bid shop and field labor properly instead of loading everything into one rate.
Woodwork shops
Want a second read on an architectural package before committing shop capacity to it.
General contractors
Carry millwork inside a fit-out and need it priced by someone who reads elevations for a living.
Architects and interior designers
Use our numbers to check that what they specified is still inside the budget they were given.
Developers
Want the woodwork priced before a fit-out budget is signed off, not after the shop quotes land.
If the millwork package is the line on your bid nobody wants to own, that's the one we're built for.
Millwork Gets Measured on Elevations
Millwork is taken off the interior elevations and the sections, because that's where cabinet heights, panel layouts and profile details actually appear. We work them in PlanSwift and Bluebeam, with Stack taking whatever format the set arrives in, and we read the millwork spec alongside the drawings rather than after them. RSMeans carries the cost data, and we price the shop side and the field side against it independently.
Every estimate carries its CSI Division 06 coding. If the same job also needs the rough carpentry behind the finish work, that's a different animal and a different number, and we price it as framing and carpentry estimating rather than folding it in here. Contractors who want the whole interior covered use us for trade-by-trade estimating across every trade on the drawings.
Our Fee Doesn't Move With the Grade
$100 to $5,000, flat, set by how much millwork is on the drawings rather than by how expensive that millwork happens to be. A Premium-grade job doesn't cost more to estimate than an Economy one; it just takes a different set of assumptions, and we make them explicitly. We settle that up front, and nothing about it changes once the work's underway.
The estimate itself takes 18 to 24 hours. Accuracy is tracked across the work we deliver, not just asserted. Got a question about the spec before we start? We reply within 20 minutes during working hours.
Wood species availability, shop rates and installation labor all shift by region, so those go in per project. We work in all 50 states.
Frequently Asked Questions
Do shop labor and installation labor really need pricing separately?
+
Yes. They're different rates on different schedules. A shop hour and a field hour aren't interchangeable, and combining them hides whichever one you underestimated. Both appear as their own lines.
Our spec doesn't name an AWI grade. What do you assume?
+
We price to Custom, which is what most commercial work assumes, and we write that assumption on the estimate rather than burying it. If the architect comes back naming Premium, you'll know exactly which lines move.
Shop drawings won't exist at bid time. Is that a problem?
+
That's the normal case. We take off the bid drawings and the spec, and flag anything left open until the shop draws it properly, so the exposure is visible while you're still bidding.
Is casework counted the same way as custom millwork?
+
No. Casework is counted by unit and bank against catalog sizes. Custom millwork is quantified item by item off the elevations, with profile and joinery noted, because no two jobs specify it the same way.
Are countertops and hardware in, or priced somewhere else?
+
Yes, both are in. Countertops by area with the material and edge detail stated, hardware counted by type. They're separate lines, not folded into a cabinet price.
What software do you use for millwork takeoffs?
+
We take off millwork in PlanSwift and Bluebeam, with Stack for any set that arrives in a format those two won't open. We price against RSMeans cost data. These are our own working tools, and we don't sell or resell estimating software.
What about the framing behind the millwork?
+
That's rough carpentry, a different scope with different numbers. Send the whole set and you'll get the millwork and the carpentry as two distinct numbers.
Content reviewed and updated: November 4, 2026
Get Your Millwork Estimate
Send the interior elevations and the millwork spec. You'll get casework and custom woodwork quantified separately, shop hours and field hours priced apart, and the AWI grade we worked to written on the estimate. Back in 18 to 24 hours. There's no paperwork to get a number out of us, and no follow-up you didn't ask for.