Elevator and Conveying Estimating Services
Home › Elevator and Conveying Estimating Services

Elevator and Conveying Estimating Services

ASPE / AACE-Aligned Elevator & Conveying Estimators Every Estimate Priced to ASME A17.1 Design and Installation Requirements Traction, Hydraulic and MRL Systems Priced by Type, Not Averaged Equipment and Installation Only, Never Bundled With Pit Waterproofing

An elevator estimate isn't one price for "an elevator." System type decides almost everything else: hydraulic, traction, or machine-room-less, and each one carries its own pit depth, overhead clearance and equipment footprint. Car, rails, hoist and controls get quantified as their own lines, and the whole takeoff lands in 18 to 24 hours at 97% accuracy.

  • Send whatever you've got, full vertical transportation drawings or just an equipment spec sheet.
  • Most estimates go out same-day.
(747) 444-4560
Upload Your Elevator Plans

Full drawings or just an equipment spec sheet, either gets the takeoff started.

18–24HR

Every system line quantified together

97%

Our own delivered-estimate track record

14CSI

Conveying Equipment & Systems division

20MIN

Working-hours turnaround on first contact

Type Decides the Number

Six Stories Is Roughly Where Hydraulic Stops Making Sense

Building height picks the elevator type before anyone picks a finish package, and the type picked changes almost every line on the estimate. Hydraulic systems top out around six stops, cost the least to install, and need no overhead machine room, but the cylinder goes into the ground below the pit, so there's a real below-grade component to price. Geared traction reaches roughly 300 feet; gearless traction has no practical ceiling. Both cost more upfront than hydraulic and run far more efficiently over the building's life.

Here's what actually goes into our estimate once the type is set. The car and cab finishes. Guide rails, running the full travel distance. The hoist and drive system, a motor and machine for traction, a cylinder and pump for hydraulic. The controller and control wiring. Doors and door operators at every landing. And installation labor cost, which moves with travel distance and stop count, not with a flat per-unit rate.

Most quotes you'll find online average a price per stop and call it done. That works until the building crosses the height where hydraulic stops making sense, or the shaft can't fit a machine room, and the number stops meaning anything. Sound familiar? We build the material takeoff off the actual equipment schedule instead, quantity by quantity, not a per-stop guess dressed up as a bid.

Not a Marketing Phrase

Machine-Room-Less Doesn't Mean No Machine

"Machine-room-less" is a real category, not a marketing phrase, but the name oversells what it does. MRL traction eliminates the dedicated machine room; it doesn't eliminate the machine. The motor and controller move into the hoistway or a compact space at the top, which changes the shaft dimensions and the overhead clearance the code requires, not the equipment list. It also carries the highest upfront investment of the four systems, the tradeoff for that shaft efficiency.

That's the part a flat quote skips. Pit depth, overhead clearance and machine-room space aren't universal numbers across hydraulic, geared traction, gearless traction and MRL. Each carries its own requirement under ASME A17.1/CSA B44, the safety code governing elevator and escalator design, construction and installation in the US, and referenced by the IBC. Seismic bracing is part of the same code in qualifying zones, and it's an equipment and labor line of its own, not something a generic install price absorbs quietly.

We price against the requirements for the system actually specified, wherever in the country the job sits, not a rule of thumb that worked on a different building's elevator.

Different Equipment

An Escalator and a Moving Walk Aren't Priced the Same Way

Escalators and moving walks both move people continuously, and estimators who've never priced either tend to fold them into one line. They're different equipment. An escalator carries a stepped tread and a defined rise; a moving walk carries a flat or gently inclined pallet and a defined length.

Different drive requirements, different structural support, different balustrade and handrail runs.

Dumbwaiters and material lifts are their own smaller category again: less travel, lighter loads, and a simpler code path than a passenger elevator, since neither carries passengers under the same code provisions a full elevator does. Still their own takeoff, priced on capacity and travel like anything else here, not a rounding error folded into the elevator count.

How It Runs

The Equipment Schedule Is Where the Takeoff Begins

Send us the plans or the spec sheet and the takeoff starts with the equipment schedule: how many units, what type, what travel distance, what capacity. From there we price the car and rails, then the hoist or drive system, then controls and doors, then the labor that scales with travel and stop count.

A single passenger elevator in a four-story office building and a bank of gearless traction cars in a high-rise aren't the same takeoff, and we've priced both against PlanSwift and RSMeans, following the ASPE/AACE-aligned discipline every trade on this site gets. New construction, modernization of an aging system, a straightforward escalator replacement: the process starts the same place every time, at what's actually specified, not what a similar-looking job cost last year.

18 to 24 hours later, you've got a number, at 97% accuracy.

Where This Stops

Equipment and Installation Only, Not the Pit Itself

This page covers the elevator and conveying equipment: the car, rails, hoist or drive system, controls, doors, and the escalator or moving-walk mechanism where that's the scope. It does not cover waterproofing the pit the equipment sits in. That's a different trade, priced under Division 07 on our waterproofing estimate, which already covers elevator pits and sumps as part of its own below-grade scope.

We draw that line because the two trades answer to different divisions of the same physical space.

Folding pit waterproofing into an elevator number, or the other way around, means guessing at a scope neither estimate was built to price.

The same split holds after installation: the equipment needs a periodic inspection and certificate under ASME A17.1 to keep running, a code obligation that belongs to the elevator system, never to whatever's keeping the pit dry underneath it.

Who Sends This

Who Sends Us This Scope

General contractors

Carrying vertical transportation inside a larger building package, one trade among many on the same set, needing a defensible number to check against a sub's bid.

Elevator and conveying subcontractors

Bidding the equipment and installation package on their own, where the margin lives in getting the system-type breakdown right the first time.

Building owners modernizing an aging system

Where the existing shaft dimensions sometimes don't match what a new system assumes, and finding that out late is expensive.

Architects and specifiers

Confirming a system type is viable for a building's height and shaft space before it's locked into the drawings, when a wrong assumption is still cheap to fix.

Fee and Clock

The Fee Scales With the Equipment You Specified

A single hydraulic elevator in a low-rise building and a multi-car gearless traction elevator package in a high-rise don't cost the same to estimate. So Master Estimating's fee scales with the equipment rather than sitting at one flat number regardless of scope: $100 to $5,000, quoted up front. Nothing about that number changes after the fact just because the drawings had one more landing than expected.

We turn most packages in 18 to 24 hours. The 97% accuracy figure comes from tracking our own delivered estimates, not a number chosen because it sounds impressive. Bid closing this week? Send the plans; our team is on it inside 20 minutes, working hours.

Four Kinds of Vertical Transportation

Residential, Commercial, Industrial and Civil Vertical Transportation

The equipment scales to whoever's using it and how often. Same four categories we price everywhere on this site.

Two elevator doors in a modern concrete multi-family building lobby
Residential

Multi-family and townhome elevators, usually a single low-rise hydraulic or MRL unit serving a handful of floors.

Three polished elevator doors in a hotel lobby, marble surround
Commercial

Passenger elevator banks in office towers and hotels, where we often price multiple gearless traction cars sharing one hoistway group.

Industrial elevator shaft interior with exposed steel guide rails
Industrial

Freight and material handling systems at plants and warehouses, sized for load rather than passenger comfort.

Escalator inside a public transit subway station tunnel
Civil

Transit stations, parking structures and public buildings, where accessibility requirements and duty cycle run heavier than a typical office elevator ever sees.

What Gets Missed

What a Modernization Job Misses That New Construction Doesn't

Existing shaft dimensions get assumed, not measured.

A modernization project inherits whatever pit depth and overhead clearance the original installation left, and a new-construction number applied to an old shaft is wrong before the first line item.

Seismic bracing gets treated as optional.

ASME A17.1 carries real seismic provisions for elevators in qualifying zones, and skipping that line on a modernization job is how a bid comes back short.

Controls interface with electrical gets missed.

The elevator's controller needs a power feed and often a fire-service interface with the building's electrical and life-safety systems, coordination work that a bare equipment price doesn't capture.

We don't estimate maintenance.

Some quotes online blend installation cost with ongoing service contracts. We price construction and installation, not a maintenance agreement, and we say so up front rather than blur the two into one number.

Questions

Frequently Asked Questions

Does the type of elevator, hydraulic, traction, or MRL, actually change the price that much?

+

Yes, more than almost anything else on the estimate. Each type carries its own pit depth, overhead clearance and machine-room requirement under ASME A17.1, and hydraulic versus traction changes the equipment list itself, not just the finish.

Escalators and moving walks, are those priced the same as an elevator?

+

No. They're different equipment with different drive requirements and structural support, and we scope each on its own terms rather than folding one into an elevator line.

Modernizing an existing elevator instead of a new install, does that change the takeoff?

+

We price it, and the existing shaft dimensions matter more than they do on new construction. A modernization takeoff starts from what the shaft actually is, not what a new-build assumption would give you.

Waterproofing the elevator pit, is that part of this scope?

+

No. Pit waterproofing gets priced under our waterproofing estimate, a different division entirely. We cover the equipment and its installation, not what's keeping water out of the hole it sits in.

Do you include ongoing maintenance costs in the estimate?

+

No. We price construction and installation only, not a service or maintenance agreement. If a quote elsewhere blends the two, ask which one you're actually being handed.

How fast do you turn around an elevator and conveying estimate?

+

18 to 24 hours for most packages, faster if the equipment schedule is complete when it lands. First contact with our team happens inside 20 minutes on a working day.

Content reviewed and updated: November 4, 2026

Get Started

Get Your Elevator and Conveying Estimate

Send the plans or spec sheet and we'll price the car, rails, hoist or drive system, controls and doors as one takeoff, matched to the system type actually specified rather than a per-stop average.

Get the equipment schedule to us and we'll build the number around it.

Upload Your Elevator Plans

Fine print: what you pay reflects the system type and equipment count on your job, never a cut of the contract value. Turnaround holds at 18 to 24 hours.