Electrical Estimating Services
On an electrical job the counting is the easy half. The hours behind it, conduit run at height, terminations, fixture tie-ins, are where a bid gets won or lost, so we price labor in man-hours against local wage rates instead of marking up material. You'll have it back inside 18 to 24 hours, at 97% accuracy. Our electrical estimating services cover all 50 states on a flat fee of $100 to $5,000, set against scope. Send drawings now and an estimator comes back within 20 minutes.
- Quote first, no commitment
- One flat fee, never hourly
- An estimator replies in 20 min
Drawings in, priced bid out
Accuracy we track, job to job
Projects priced over 9+ years
Reply while you're still at the desk
What Goes Into an Electrical Estimate
Electrical estimating services price the material, labor, and equipment for the electrical scope of a construction project, and on this trade the labor side carries most of the risk. Two things have to be right. The count: every foot of conduit and conductor, every device, fixture, panel and piece of gear on the drawings. And the hours: how long that work actually takes in the conditions the job presents. Get the count right and the hours wrong and the bid still misses, which is why our electrical estimates are built from man-hours and local wage rates rather than a percentage laid over the material total.
The quantities come off your one-lines, panel schedules and floor plans, counted by type and size, not scaled off a square-foot rule of thumb. Then each quantity gets the hours it genuinely needs, adjusted for the things that slow a crew down: mounting height, an occupied building, a hard ceiling, a long pull.
What comes back is broken out so you can see it, gear separate from branch wiring, lighting separate from low-voltage, material separate from labor. Electrical is one trade among the many we cover in our construction estimating services, and we price it for electrical contractors, GCs, developers, EPC and design-build teams, and the low-voltage and instrumentation shops carrying part of the same package.
Where the Hours Go: How We Price Electrical Labor
Material pricing is a phone call. Labor is judgment, and it's the number that decides whether an electrical bid holds. Here's how we build it.
| Scope element | We count it in | What drives the hours |
|---|---|---|
| Conduit & raceway | Linear feet, by type and trade size | EMT, rigid or PVC; mounting height; open ceiling versus hard lid |
| Conductors & cable | Linear feet by size, plus terminations | Wire size, pull length, and the number of terminations at each end |
| Boxes, devices & plates | Each, by device type | Device type, box type, and how much finish work follows |
| Lighting fixtures | Each, by fixture type | Fixture weight and mounting, ceiling type, controls tie-in |
| Panels, gear & feeders | Each, with circuit counts | Gear size, termination count, and coordination with other trades |
Those hours then get costed at the wage rates where the job actually is, because an hour of electrical labor isn't priced the same in rural Ohio as it is on a union job in Chicago. Working to a specific crew composition or an agreement rate? Send it with the drawings and we'll estimate to it.
Service, Distribution & Gear We Quantify
The equipment half of the estimate, where a handful of line items carry a large share of the dollars.
Gear is also where schedule risk lives. When a panel or a piece of switchgear on your drawings is the kind of item that carries a long lead time, we flag it with the estimate rather than letting you find out after the award.
Branch Wiring & Devices We Quantify
Fewer dollars per item than gear, far more hours in total. It's the half that rewards an accurate count.
Lighting & Lighting Controls
Lighting gets counted off the fixture schedule, and the controls get counted with it, because a dimmed and sensored space isn't the same labor picture as a row of switched troffers.
Low-Voltage & Special Systems Scope
Plenty of electrical packages carry more than power. Cable tray, low-voltage device counts, rough-in and pathways for fire alarm, data and security, and the control wiring that ties equipment together all get quantified when they're in your scope, and we say plainly which of them we've priced. Access control at the opening itself, card readers and electric strikes, is quantified alongside doors and windows estimating.
Those systems sit in their own CSI divisions rather than under Division 26 electrical, so if one is engineered by someone else and you only carry the pathway, that's what we estimate, the raceway and boxes, not a system we're not pricing. Where a job bundles electrical with mechanical work, our estimating company can price the other trades in the same package so every number rests on one consistent set of assumptions.
From Drawings to a Priced Bid
Send your drawings
Upload the electrical sheets, one-lines and panel schedules. A partial set is fine to start; call us if the drawings are still moving.
We agree the scope and the labor basis
An estimator confirms what's in and out, and what wage basis to price to. Anything ambiguous gets raised the same day, not the morning the bid's due.
We count it, then we cost the hours
PlanSwift, Bluebeam or Accubid for the count, then man-hours against current regional rates. The same construction estimators stay on your job start to finish.
You get a bid-ready estimate
One more pass against the panel schedule catches anything the first count missed. Then it's material and labor split by system, gear separate from branch, delivered in 18 to 24 hours.
Electrical Scope by Project Type
A house rough-in and a plant control package are different estimating jobs. At Master Estimating, we estimate residential, commercial, and industrial electrical work plus civil and site scope, and route your drawings to an estimator who works that side of the trade.

Rough-in, device counts, panels and fixture packages for homes, additions and multi-family.

Tenant fit-outs, distribution, lighting and controls for office, retail and medical. Most weeks this is what's on the desk.

Motor connections, controls, heavier gear and instrumentation pathways for plants and warehouses.

Site lighting, underground duct bank, service runs and substation-adjacent work.
Why Electrical Contractors Hand Us the Hard Bids
On electrical it usually comes down to the labor line. Anyone can price a reel of wire; the question is whether the hours behind it were thought about, or borrowed from a percentage.
Labor built from man-hours
Hours applied item by item against local wage rates, so the biggest number on the bid is one you can actually interrogate.
Gear and branch wiring priced apart
Switchgear carries the dollars, branch wiring carries the hours. Blend them and you lose sight of both.
Long-lead gear flagged early
If a panel or a switchboard on your drawings is the kind of item that sits in a queue for months, you hear about it with the estimate, not after the award.
97% accuracy, 7,100+ projects
Tracked, not claimed, across 9+ years and enough electrical scope to know what conduit, gear and hours really run.
18 to 24 hours, and a 20-minute reply
You hear from an estimator within 20 minutes in working hours, so you're never left guessing whether the job landed.
Accubid, and ASPE/AACE discipline
Accubid was built for this trade, and we use it for electrical takeoff to the estimating standards ASPE and AACE set. Flat fee agreed before we start, and it doesn't move.
The Toolset Behind an Electrical Estimate
Electrical is the one trade with a genuinely purpose-built takeoff tool, so the toolset leans on it. Stack covers us when several jobs are running at once.
Electrical takeoff, the closest thing this trade has to a purpose-built tool. It carries labor units, so the hours stay attached to the items.
Counting conduit runs, device rough-ins and fixture types straight off your electrical sheets.
Marking up one-lines and panel schedules, and measuring feeder runs where the drawing is the only source.
Current electrical labor and material costs for the region the job is actually in, which is the whole argument of this page.
The estimating standards our process is aligned to, applied the same way on a house rough-in and a plant package.
Takeoff, Priced Estimate, or Full Bid Package
Not every job needs the same deliverable. Three levels, and the fee tracks which one you pick and how much electrical scope there's to measure.
Quantities only
A clean electrical takeoff you price in-house with your own vendor and labor numbers.
Priced estimate
An electrical cost estimate, the takeoff plus material and labor priced to your region, broken out by system.
Full bid package
The priced estimate plus value engineering options and a bid ready to submit.
You pay one flat fee of $100 to $5,000, set by the level you choose and the amount of electrical scope to measure and price, never by the hour. The figure quoted up front is the figure billed, with nothing added afterward. Expect the bottom of that range for a small residential rough-in, and the top for a multi-building industrial package carrying full gear and controls.
How Fast an Electrical Estimate Comes Back
Most electrical estimates land within 18 to 24 hours of us receiving the drawings, and you hear from a person long before that: an estimator picks it up within 20 minutes during working hours to settle scope and flag whatever needs a decision.
Larger industrial or multi-building packages can take longer, and when one will, you'll know on day one rather than day three. We staff for a fast turnaround, because an estimate you get a day early is one you can actually check before it goes out.
Frequently Asked Questions
Do you price electrical labor in man-hours or as a percentage of material?
+
Man-hours, applied item by item and costed at the wage rates where the job is. A percentage laid over the material total hides exactly the things that move an electrical bid, mounting height, pull lengths, termination counts and site conditions.
What is included in an electrical takeoff?
+
Five things, every takeoff.
- Conduit and conductors By type and size, not aggregated.
- Boxes, devices and plates Counted by device type.
- Lighting Fixtures and controls, straight off the schedule.
- Distribution Service, switchboards, panels, breakers, transformers, feeders and grounding.
- Labor hours Applied to each line, not spread as a percentage.
Can you estimate low-voltage, fire alarm and data scope?
+
Yes, where it's in your scope. That includes cable tray, low-voltage device counts and the raceway and boxes for fire alarm, data and security. If another party engineers the system and you only carry the pathway, we price the pathway and say so.
Will you estimate to our union or agreement wage rates?
+
Send the rates or the crew composition with the drawings and we'll price to them. Otherwise we use current regional rates for the job location, which is why an estimate for rural Ohio doesn't carry Chicago labor.
How much does an electrical estimate cost and how fast is it?
+
A flat $100 to $5,000 depending on the level you order and the scope involved, quoted before we start. Most estimates come back within 18 to 24 hours, with an estimator replying inside 20 minutes during working hours.
Content reviewed and updated: November 4, 2026
Put Real Hours Behind Your Electrical Bid
Send the sheets and you'll have an electrical estimate in 18 to 24 hours with the hours costed to your region, not borrowed from a percentage. That's 7,100+ projects and 9+ years of doing it this way, in all 50 states.
An estimator replies within 20 minutes in working hours. Early enough that you can argue with the labor line before it goes out, and that's rather the point.
Quote first, no commitment. One flat fee, agreed before we start. Rather talk it through? Pick up the phone.