Construction Takeoff Services
Home › Construction Takeoff Services

Construction Takeoff Services

ASPE / AACE-Aligned Takeoff Specialists Marked-Up PDF & Editable Excel Every CSI Division Counted Inclusions and Exclusions in Writing

You send drawings. Your construction takeoff comes back as line-item quantities on a marked-up PDF, plus an editable Excel file set up the way your bid needs it. Quantities, not prices, unless you want both. Most land in 18 to 24 hours, flat fee $100 to $5,000, every CSI division, all 50 states.

  • You see the fee before we count anything
  • Every count comes back marked on your own plans
  • A takeoff specialist answers in 20 min
(747) 444-4560
Send Drawings for a Takeoff
18–24HR

Drawings in, counts back

97%

Counting accuracy, tracked

7,100+

Projects on the books, 9+ years

20MIN

A specialist replies, working hours

The Deliverable

What You Get Back

A construction takeoff is a measured count of the materials, equipment and labor quantities shown on a drawing set, delivered as line-item quantities you can price. Most of the field will tell you that much. Fewer will tell you what actually lands in your inbox, so here it is, in four parts.

Line-item quantities

Every counted item on its own row with its own unit, broken out trade by trade. Not a lump figure you have to unpick before you can bid it.

Your plans, marked up

A color-marked PDF of the drawing set showing exactly what we counted and where. If a number looks wrong to you, you can go straight to the sheet it came from and check it.

An editable Excel file

Not a locked PDF summary. A working spreadsheet you can drop your own rates into, re-sort, or paste into whatever bid software you already run.

Organized the way you bid

By CSI division as standard, or by your own cost codes, or in your own template if you send it. The count is the same either way. The layout should fit your process, not ours.

Close-up of a floor plan marked up during a quantity count
Every quantity traceable to the sheet it was counted from
The Boundary

Where a Takeoff Stops and an Estimate Starts

This is the question worth settling before you send anything. A takeoff answers how much there is. A cost estimate answers what it'll cost. We do both, but they're separate jobs, and a lot of confusion in this market comes from providers blurring the two.

Construction takeoffCost estimate
Counts and measures what's on the drawingsApplies pricing to those counts
Output is quantities, by unitOutput is dollars, by line and in total
Doesn't assume your rates, your crews or your suppliersHas to assume all three, or use yours
What you want if you price in-houseWhat you want if you need a bid-ready number

Most contractors who come to Master Estimating already price their own work. They've got their rates, their crews and their supplier relationships, and none of that belongs to us. What they don't have is the hours it takes to count a full drawing set. So the takeoff is the piece they hand over. If you'd rather have the priced number as well, that's cost and budget estimating, and it's a different service on a different page. Either way the count stays in-house, and our construction cost estimating work picks up from those same numbers.

Still deciding between the two? Say what you're doing with it, and we'll tell you. If quantities alone will do the job, we'll say so rather than sell you the bigger service.

Three Ways In

Material Takeoff, Quantity Takeoff and Blueprint Takeoff

Three names you'll see used almost interchangeably across this market. They aren't quite the same thing, and knowing which one you're asking for saves a round of emails.

Material takeoff

A count of physical materials only. Linear feet of pipe, square feet of board, cubic yards of concrete, counts of fixtures and devices. What you order from, and what a material vendor wants to see. Sometimes shortened to MTO on a bid package.

Quantity takeoff

Broader. Materials plus the quantities that drive labor and equipment, which is what you need if the count is feeding a full estimate rather than a purchase order. Delivered as a bill of quantities where the job or the client calls for that format.

Blueprint takeoff

Same measured count, named for where it comes from: the drawing set itself. Older sets, scanned sheets, a marked-up revision, or a PDF exported straight out of the design software. If it's legible we can count it.

Honestly, most people asking for one of these will accept any of the three. Tell us what the count is feeding, an order, a bid, a budget, and we'll scope it right. The difference matters more on paper than it does on the phone.

Coverage

Every CSI Division, Counted

Whole packages and single trades both get counted, across residential, commercial, and industrial work plus civil and site scope. Here's the spread our estimators cover.

Sitework & earthwork Concrete Masonry Metals & structural steel Wood, framing & millwork Thermal & moisture protection Openings: doors & windows Finishes: drywall, flooring, paint Fire suppression Plumbing HVAC & mechanical Electrical & low voltage Exterior improvements & utilities

Running a multi-trade package? That's the common case, and MEP is usually the piece that decides whether the whole count holds together. Where a single trade carries the job, we have pages that go deeper into that scope on its own: electrical, plumbing and concrete each price differently enough to warrant it.

Electrical, plumbing and mechanical arriving together rather than separately is a different job again, and it prices on an MEP estimate.

How It Runs

How We Count Your Drawings

01

You send the set

Upload the drawings through the form, or email them. A phone call works if the scope needs talking through first. No account, no portal, no sales call before anyone looks at your plans.

02

We scope it and quote a flat fee

A takeoff specialist reads the set, confirms which trades you want counted and what format you need back, then quotes one flat fee. You approve it before any counting starts.

03

The count runs on screen

On-screen takeoff in PlanSwift and Bluebeam, measured off your sheets at scale, with Stack where a job runs across several packages at once. Everything gets marked as it's counted, which is what makes the PDF you get back checkable. Where you've asked for pricing as well, those counts carry into RSMeans for current regional rates.

04

You get the counts and the marked plans

The Excel sheet and the marked PDF get compared line for line before either one ships. What lands in your inbox is quantities in Excel plus the color-marked PDF, inside 18 to 24 hours, with our scope notes attached so you can see what we included and what we left out.

Estimator running an on-screen takeoff at a workstation
Counted at scale on screen, not eyeballed off a printout
Scope Notes

What's Included, and What Isn't

Every takeoff we send carries a written scope note. It's the least exciting page in the package and probably the most useful, because an argument about what was counted is worse than an argument about what it costs.

Included as standard
Every trade you asked us to count, line by line Waste and lap allowances, stated as a rate, not buried The marked-up plan set the counts came off Assumptions we had to make where the drawings were unclear
Not included unless you ask
Pricing. A takeoff is quantities; pricing is a separate service Scope the drawings don't show, so nothing is invented to fill a gap Design work, engineering, or load calculations of any kind Trades outside the package you scoped with us

That second column is the one people read twice. We'd rather flag a gap in the drawings than quietly fill it with a number nobody can trace. If something on your set can't be counted, you'll hear about it while there's still time to get an answer from the design team. That discipline is a fair part of why our counts hold at 97% accuracy, tracked across delivered work: nothing gets invented to make a column add up.

Flat Fee

Turnaround and What It Costs

$100to$5,000

One flat fee, $100 to $5,000, set by how many sheets and how many trades there are to count. Quoted before we start and billed exactly as quoted. Never hourly, so a complicated set doesn't quietly become a bigger invoice. Counts come back in 18 to 24 hours.

Single trade, small set

Toward the lower end

Multi-trade package, commercial set

Mid-range

Full building, multi-package or industrial

Toward the upper end

Timing

Most sets come back within 18 to 24 hours. The reply you get inside 20 minutes during working hours isn't an auto-acknowledgement, either: someone opens the set, checks the sheets are legible and carry a usable scale, and tells you straight away if a detail needs an answer from the design team before counting can start.

A count that lands a day early is one you can still question before the bid goes out.

A multi-building package or a full campus set needs longer, and you'll have the real date in the quote rather than on the morning it was due.

Who We Count For

Seven Kinds of People Send Us Drawings

Takeoff work isn't only a contractor service, which surprises people. Across 9+ years and 7,100+ completed projects, the drawings arrive from further up and further down the chain than you'd expect. Our construction estimators count for all of them.

General contractors

Whole packages under a bid deadline, usually multi-trade, usually this week.

Subcontractors

One trade, counted properly, so a bid isn't built on a number scribbled at 11pm.

Builders & remodelers

Smaller sets where hiring an in-house estimator has never made sense.

Developers

Early quantities to test whether a scheme works before design money goes in.

Architects & designers

Quantities to sanity-check a design against a client's budget.

Lenders

An independent count to check a borrower's numbers before releasing a draw.

Material vendors

Counts to quote off, straight from the plans, without tying up a sales estimator.

Questions

Frequently Asked Questions

What do takeoff services include?

+

Four things, and nothing beyond a takeoff.

  • Line-item quantities For every trade you asked us to count.
  • A color-marked PDF Of your own plans, showing where each number came from.
  • An editable Excel file
  • A written scope note What we included, what we left out, and any assumption we had to make.

Do I get prices, or only quantities?

+

Quantities, unless you ask for pricing as well. A takeoff counts what's on the drawings. Applying rates to those counts is cost estimating, which is a separate service. Plenty of contractors take the counts and price them in-house with their own rates.

How much does a construction takeoff cost?

+

A flat fee between $100 and $5,000, set by the number of sheets and trades and quoted before any counting starts. Never hourly, and never adjusted after the fact.

What file formats do you deliver in?

+

An editable Excel file plus a color-marked PDF of the drawing set. We'll set the sheet up to whichever structure you bid from, whether that's CSI divisions, your own cost codes, or a template you send us.

Is a material takeoff the same as a quantity takeoff?

+

Close, not identical. A material takeoff counts physical materials to order from. A quantity takeoff is broader and includes the quantities that drive labor and equipment, which is what you need if the count feeds a full estimate. We run both.

Can you count from scanned or older drawings?

+

Usually, yes. We count on screen from PDFs, including scanned sets, as long as the sheets are legible and carry a usable scale. If a sheet can't be counted reliably, we tell you before starting rather than guessing.

Content reviewed and updated: November 4, 2026

Get Started

Send Your Drawings

Counts back in 18 to 24 hours: line-item quantities, your plans marked up, an editable Excel file, and a scope note that says plainly what we counted and what we didn't.

A takeoff specialist replies within 20 minutes during working hours, so you'll know the fee and the timing before you commit to anything.

Send Your Drawings

Quoting is free and commits you to nothing. One flat fee, agreed before any counting starts. Not sure which takeoff you need? Ring us and we'll work it out in five minutes.