CPM and Construction Scheduling Services
Home › CPM and Construction Scheduling Services

CPM and Construction Scheduling Services

ASPE / AACE-Aligned Estimating Team, Now Scheduling Your Project Too A Companion to Your Estimate, Not a Standalone Forensic Practice Baseline Schedules Built for Primavera P6 and Microsoft Project, Division 01 Ready No Delay Claims, No Litigation Support, Just the Schedule Your Contract Requires

CPM and construction scheduling services from Master Estimating build the baseline schedule your contract may already require: a critical path, a work breakdown structure, and the periodic updates that keep it current, delivered as a Primavera P6 or Microsoft Project compatible file. It's the same team that already turns a cost estimate around in 18 to 24 hours at 97% tracked accuracy, adding a schedule alongside it instead of sending you to a separate forensic scheduling firm. Reply within 20 minutes during working hours.

  • Same team as your estimate, not a separate scheduling firm
  • Baseline schedule, work breakdown structure, critical path and float, periodic updates
  • No delay-claims analysis, no litigation support, ever
(747) 444-4560
Cost, Schedule, or Both

Send the drawings, the spec section if your contract names one, and tell us whether you need cost, schedule, or both.

18–24HR

Your estimate's turnaround, same as always

97%

Estimate accuracy, tracked, not the schedule

01DIVISION

Where your contract likely asks for this

20MIN

Reply time, to scope either one

Two Documents

The Estimate Answers What It Costs. The Schedule Answers When.

Two different questions, two different documents. An estimate tells a contractor what a project costs. A schedule tells them how long it takes, and in what order the work has to happen for that cost to hold.

Most of the searches that reach us are actually looking for one of two things: a CPM schedule because a contract specification asked for one, or a schedule to sit alongside an estimate that's already in hand, so the whole picture, cost and time, comes from one desk instead of two.

That's the service. Master Estimating builds construction schedules using the Critical Path Method, the same network-logic approach that shows which tasks can slip a little and which ones can't slip at all without pushing the finish date. We're not a separate firm you call after the first one falls through. We're the same estimating team, adding a second deliverable.

Here's our honest version of why that matters. A lot of the CPM scheduling market is built around disputes: a project that's already gone sideways, a claim that needs defending, an insurance file that needs a forensic timeline reconstructed after the fact. That's real work and it's a real specialty. It just is not this page. This page is for the schedule you need before anything goes wrong, not the one you need after.

What You Get

Baseline, Breakdown, and the Updates That Keep It Honest

A baseline CPM schedule is the starting point, and it has three parts that actually matter.

The work breakdown structure

Every activity broken into pieces small enough to sequence, not a single "construction" bar running the length of the job.

The network logic itself

The critical path, the string of dependent tasks whose total duration sets your minimum finish date, plus the float sitting on everything that isn't on that path.

The schedule updates

A schedule built once and never touched again is a snapshot, not a tool, so we deliver periodic updates that track actual progress against the baseline and flag drift before it becomes a missed date.

Our project controls team builds all of this the way any construction estimating services engagement starts, off your drawings, your specifications, and whatever sequencing constraints your contract already spells out. You get the schedule back as a Primavera P6 or Microsoft Project compatible file, not a PDF you can look at but not touch. Open it, filter it, run your own updates against it later if you want to.

Two things we don't do to this document: we don't pad it with float nobody asked for to make the schedule look safer than it is, and we don't hand you a bar chart with no logic behind it and call it CPM. If the tasks aren't actually linked, it isn't a Critical Path Method schedule, whatever software drew the bars.

Buried in the Spec Book

The Spec Already Asked for a CPM Schedule

Here's something a lot of contractors don't clock until it's already a problem: on plenty of public and federal work, a CPM schedule isn't optional. It's a Division 01 submittal, called out by name in the general requirements section right alongside your bond and your insurance certificate. The U.S. Army Corps of Engineers' own guide specification for this, UFGS 01 32 01.00 10, "Project Schedule," says exactly that: scheduling the entire project, design sequence and construction sequence both, is required, and it directs the contractor to use the Critical Path Method of network calculation to build it.

That's not an isolated example. Plenty of state DOT and municipal contracts write their own version of the same requirement. So if you've got a spec book sitting on the truck seat and you haven't gotten past Division 01 yet, it's worth a second look before you assume the schedule is a nice-to-have. Miss it and you're not just short a document, you're out of compliance on a contract requirement that was sitting there in plain text the whole time.

We build to that requirement directly. Same team, same drawings you already sent for the estimate, one more file that satisfies the general requirements section instead of a separate procurement process to find someone who does only that.

What This Isn't

We Build the Schedule, Not the Case Against You

Standalone scheduling consultancies do real, specialized work: schedule delay analysis, time impact analysis built for a courtroom or an arbitration, collapsed as-built reconstructions, expert-witness testimony when a dispute goes that far. If your project is already in a fight over lost time, that's a legitimate, separate professional service, and it's not what we do. This section exists because most of what ranks for "construction scheduling services" is a different business than ours, and we'd rather say so than let you find out the hard way.

Here's what we build.

Baseline CPM schedule

The starting point every update tracks against.

Work breakdown structure

Every activity broken into pieces small enough to sequence.

Critical path and float reporting

Which tasks can slip, and which can't.

Periodic progress updates

Tracked against the baseline, not re-derived from scratch.

Primavera P6 or Microsoft Project file

Delivered in the format your team already runs.

Here's what we don't build.

Forensic schedule delay analysis

A different, specialized service.

Litigation-ready time impact analysis

Built for a courtroom or an arbitration, not a job site.

Expert-witness or dispute support

Not an assignment we take.

Claims consulting of any kind

That's a claims consultant's work, not an estimator's.

If you need that second list, you need a claims consultant, not an estimator, and we'll tell you that up front rather than take the assignment and figure it out later. What we're good at is the schedule that keeps a job from ending up needing one.

Two Reasons to Call

Two Different Reasons to Call About a Schedule

Most requests fall into one of two buckets.

Contractual

A public agency, a general contractor on a bonded job, or a construction manager whose contract already names a CPM schedule as a deliverable, usually with a submittal deadline attached.

Practical

An owner, developer, or GC who already has (or is getting) a cost estimate from us and wants the timeline that goes with it, so a lender, a partner, or their own project manager can see cost and duration on the same page.

Either reason works. We do not charge more to hear "my contract requires this" versus "I just want to know when this finishes." Send the drawings and the spec section if you have one, tell us which situation you're in, and we'll scope it from there.

Questions

Frequently Asked Questions

Our contract just says "submit a CPM schedule." What exactly do we get back?

+

A baseline schedule with the full work breakdown structure, the critical path and float clearly marked, and a Primavera P6 or Microsoft Project compatible file you can open and update. If your spec names a specific format or submittal template, tell us and we'll match it.

We already have an estimate from you. Does the schedule cost extra?

+

It's scoped and quoted separately from the estimate, since a full CPM build is a different amount of work than a takeoff. The estimate keeps its usual 18 to 24 hour turnaround either way; the schedule gets its own quote once we've seen the scope.

Is this the same as hiring a forensic scheduling consultant for a dispute?

+

No. We build the schedule your project runs on. Delay-claims analysis, time impact analysis for litigation, and expert-witness work are a different, specialized service, and we'll say so rather than take that assignment.

Can you build the schedule from a rough drawing set, or do you need the full contract documents?

+

A rough set is enough to start a draft. The tighter the documents, the tighter the sequencing, so if you have the spec section that calls for the schedule, send it, it usually tells us the format and update frequency the owner expects.

Our team runs Microsoft Project, not Primavera. Does that rule us out?

+

Not at all. We deliver a file compatible with whichever program your team already runs, so you can open it, filter it, and run your own updates instead of just reading a printout.

You turn estimates around in a day. Does the schedule move that fast too?

+

No, and we'd rather tell you that than overpromise. We reply within 20 minutes during working hours to scope the request, but a full baseline build and its updates take longer than a takeoff. We'll give you a real date once we've seen your drawings and spec.

Content reviewed and updated: September 27, 2026

One Team, One Desk

Get Your Estimate and Schedule

Send the drawings, the spec section if your contract names one, and tell us whether you need cost, schedule, or both.

Reply within 20 minutes during working hours, and if it's just the schedule you're after, that's a fine place to start too, you don't need a full estimate in hand first. One team, one point of contact, cost and time from the same desk.

Send the Drawings and the Spec