Steel & Structural Estimating Services
Home › Steel & Structural Estimating Services

Steel & Structural Estimating Services

ASPE / AACE-Aligned Structural Steel Estimators Tonnage Off the Section Weights, Not an Allowance Connections Counted Even Where They Aren't Designed Yet CSI Division 05 Structural Steel Framing Coverage

Every beam on the drawings already tells you what it weighs, and that is where structural steel estimating services start: length times section weight gives tonnage. What tonnage won't tell you is the price, because connections drive the shop hours. The fee is a flat $100 to $5,000, the turnaround 18 to 24 hours, and the accuracy 97%. First reply in 20 minutes.

  • Tonnage built from published AISC section weights
  • Connections priced as their own scope, delegated ones flagged
  • A steel estimator answers in 20 min
(747) 444-4560
Send Your Structural Set

Framing plans, column schedules, sections and details, and the structural notes. Partial sets are fine, most of what we price is bid off a set that isn't final.

18–24HR

Structural set in, priced takeoff out

97%

Accuracy, tracked

05CSI

Division 05 coding on every job

20MIN

Reply from a steel estimator

What Counts as Structural

The Frame, Not the Studs

Structural steel is the hot-rolled skeleton: columns, beams, joists, girders, bracing and the metal deck that spans between them, plus the connections that hold it together and the miscellaneous steel that hangs off it. It sits in CSI Division 05, Metals, specifically 05 12 00, Structural Steel Framing.

Worth separating that from its neighbor in the same division. Cold-formed light-gauge studs and tracks are Division 05 40 00, a different trade with different crews, different tools and a different number, and we price that as framing and carpentry estimating. A stud wall and a moment frame are not the same job. If your project has both, send the whole set and you'll get both, kept apart.

Two more boundaries. Rebar is concrete reinforcement, not structural steel, and it's priced with the concrete. And we're an estimating service, not a mill and not a fabricator, so this isn't a steel quote and we're not selling you the material. Master Estimating works with fabricators, erectors and general contractors carrying a steel package.

The Weight Half

A W21x44 Tells You What It Weighs

The designation on the drawing is doing more work than most people notice. A W21x44 is a wide-flange section roughly 21 inches deep that weighs 44 pounds for every foot of its length. That second number isn't a size, it's a weight, published by AISC along with every other section property.

So the arithmetic underneath a steel takeoff is simple to describe and unforgiving to get wrong: measure the length of every member, multiply by its published weight per foot, and you have its weight. Add them up and you have the job's tonnage.

Tonnage matters because it's the unit everything downstream actually runs on.

The mill

The mill sells steel by weight.

The trucker

The trucker charges by weight.

The crane

The crane on site is rated by weight, and what it can pick at what radius decides how the frame gets erected.

Get the tonnage wrong and every one of those numbers is wrong with it.

The Labor Half

The Connections Are Where the Hours Go

Anyone who treats tonnage as the answer gets caught here. Two frames can weigh exactly the same and still be nowhere near the same price to fabricate, because weight measures the material and says nothing about the labor.

Same weight, different hours

A simple shear connection with a couple of bolts and a plate is a different amount of shop time from a fully welded moment connection with stiffeners and doubler plates. Same steel on the scale, nowhere near the same hours.

Designed after award

It gets sharper. On a lot of jobs the connections aren't designed when you're bidding. The structural engineer sizes the members and specifies the loads, then delegates connection design to the fabricator's engineer, to be resolved after award. You'll see it written on the drawings in plain language: delegated design, design connection for moment and shear. Which means a real share of the plate, bolts, welding and shop hours has to be priced before anyone has drawn it.

We price the connections as their own line, against what the framing plan and the structural notes actually imply, and we write down what we assumed.

Burying them inside a rate per ton is how a steel bid quietly goes wrong.

The Deliverable

Everything That Gets a Piece Mark

The takeoff comes back grouped the way a fabricator actually works, not as one aggregate weight.

Main members

Columns, beams, girders, joists and bracing, each by length and section, with the weight per foot applied to get its tonnage.

Metal deck

By area and profile, with the gauge and any required attachment noted.

Connections

Plates, angles, bolts and welds quantified as their own scope, flagged where the design is delegated.

Miscellaneous steel

Stairs, ladders, handrails, lintels and embeds, tracked separately from the primary frame because they price and fabricate differently.

Piece marks and counts

So the numbers reconcile against a shop's own list rather than sitting in a lump.

Tonnage summary

Broken out by shape and grade, not rolled into a single figure.

Labor cost

Shop hours against the connection types actually specified, and erection hours against the sequence the frame implies.

Anything the drawings pushed downstream to the shop gets named where it lands.

Every Scale

Steel Shows Up at Every Scale

A steel frame can be four columns and a few beams over a retail unit, or a hospital's braced core with hundreds of moment connections. The tonnage scales, but so does the proportion of the number sitting in connections rather than members, which is why the two don't move together.

Carports and canopies are their own case: the frame is steel work, but the array bolted on top of it prices on a solar estimate.

Bundles of galvanized steel sections stacked in a laydown yard beside a truck-mounted crane
Residential

Houses and small buildings, usually a handful of beams and posts carrying openings.

Workers assembling a multi-story steel frame with cranes overhead
Commercial

Multi-story frames where the connection count grows faster than the tonnage does.

A long industrial roof carried on red-painted steel beams
Industrial

Long-span portal frames, heavy tonnage on a comparatively short list of members.

Steel beams spanning a bridge deck under construction against a clear sky
Civil & Public

Bridges and infrastructure, where the specification and inspection regime tightens.

Who Sends Us Structural Sets

The Bid Passes Through Three Sets of Hands

Steel gets bid, fabricated and erected by different companies, and each of them reads the same drawings looking for a different thing.

Fabricators

Send us the set to get tonnage and connection counts they can put shop hours against, without burning an estimator's week on columns.

Erectors

Want the piece counts and weights that decide crane sizing and sequence.

General contractors

Hold the steel inside a much larger bid, and want it costed by people who spend their days in structural sets.

Developers and owners

Want the frame costed early, because on a steel-framed building it's one of the first real numbers available.

If the structural set has been sitting in your bid folder because nobody has a spare week for it, that's the job.

Toolset

Reading a Frame Off the Structural Set

Framing plans, sections and details get measured in PlanSwift and Bluebeam. Anything neither of them opens, we run through Stack. Columns take longer than beams and always have, especially on a set with no column schedule, so that's where the care goes. Section weights come from the published AISC properties rather than from anyone's memory, and RSMeans supplies the current rates the finished material takeoff is priced against.

The whole takeoff ships coded to CSI Division 05. Revisions are the other thing worth naming: steel jobs get bid off a partial set and then a fresh one lands, so we track what actually changed between issues instead of re-counting from scratch. Contractors who'd rather not staff that internally use us as an estimating bench across the whole drawing set.

Fee, Turnaround, Coverage

We Don't Charge by the Ton

The fee is a flat $100 to $5,000, and it tracks how much steel there is to price, not how much of it there is to lift. A heavy industrial frame doesn't cost more to estimate than a light one of the same complexity, and you'll know the fee before we start.

Turnaround

The estimate lands inside 18 to 24 hours.

Accuracy

Accuracy holds at 97%, tracked job by job across the work we deliver.

Questions

Anything unclear in the structural notes gets an answer in 20 minutes, working hours.

Mill availability, fabrication capacity and erection labor all move by region and by market, so those go in per project rather than being assumed flat. All 50 states. A fair number of fabricators found us with a single package and now push their overflow to an estimating back office instead of hiring one.

Questions

Frequently Asked Questions

Our connections aren't designed yet. Can you still price them?

+

Delegated design is the normal case, and the connections line exists precisely because of it. We price against what the framing plan and structural notes imply, flag every opening assumption, and mark which connections are the fabricator's engineer to resolve.

Do stairs, ladders and handrails come with the frame?

+

Included, and kept separate. Stairs, ladders, handrails, lintels and embeds are quantified on their own lines, because they fabricate and price differently from columns and beams even though they're in the same division.

Where does structural steel stop and light-gauge framing start?

+

At the division subsection. Hot-rolled framing is 05 12 00 and is what we price here. Cold-formed studs and tracks are 05 40 00, a genuinely different trade, priced as framing and carpentry. If the set carries both, you get two numbers, not one blended figure.

The set we're bidding isn't final. Is that a problem?

+

No, and pretending otherwise would be the problem. Most steel is bid off a partial set. When the next issue lands, we work the difference rather than starting again, so your number moves by what actually changed.

Do you give us tonnage or a priced estimate?

+

Whichever you need. Some fabricators want quantities and piece counts to price with their own rates; others want the full material and labor number. Tell us which at upload and we'll build it that way.

Does rebar in the foundations land on this takeoff?

+

Not us, on this page. Reinforcing steel is concrete work and gets priced with the concrete scope, so it stays off the structural steel takeoff.

Content reviewed and updated: November 4, 2026

Get Started

Get Your Steel Estimate

Send the framing plans and the structural notes, and you'll get tonnage built from published section weights, connections priced as their own scope with the delegated ones flagged, and miscellaneous steel kept off the frame's number. Back in 18 to 24 hours. Nothing to sign, and nothing owed if the number isn't what you hoped.

Upload Your Plans

Tonnage off the section weights, connections priced on their own, delegated design flagged where it sits.