Solar Estimating Services
If you're bidding a solar job rather than buying one for your roof, you're in the right place. Our solar estimating services price the array, racking, inverters and interconnection. First thing we settle is which nameplate the drawings mean, because DC and AC aren't the same figure. Flat $100 to $5,000 by scope, back in 18 to 24 hours at 97% accuracy.
- Module and string counts read off the array layout
- Electrical and structural scopes kept apart on the deliverable
- A solar estimator answers in 20 min
Layout in, both halves priced
Measured on finished work
Plus Division 48 generation
Before someone picks it up
What Sits Between the Modules and the Grid
Solar estimating services are the takeoff and pricing of a photovoltaic system's full construction scope, from modules and racking through inverters and interconnection.
That scope is wider than most people expect, and it straddles two disciplines. Half of it is electrical work sitting in CSI Division 26 and Division 48. The other half is structure and civil work: steel, foundations, sometimes a road. Here's what we count.
Modules and mounting
Module count off the array layout, by type and wattage, with the string configuration that feeds it.
Racking
Rails, clamps, torque tubes and trackers, quantified by row and by module rather than by weight.
Foundations and attachment
Driven piles, helical piles, ground screws, concrete ballast, or the rooftop equivalent.
Inverters and DC collection
String or central inverters, combiners, DC feeders and the conduit carrying them.
AC side and interconnection
From the inverter output through to the point of common coupling.
Balance of system
Grounding, monitoring, labels, disconnects, and the pieces that get forgotten until the inspector asks.
Where we stop matters as much. We price the generation array and its interconnection; the building's own power distribution, its service and its branch wiring belong on an electrical estimate. And on a carport or canopy, the steel frame carrying the array is a structural package with its own number, priced as a steel estimate.
The Nameplate Hides a Third of the Job
Somebody says "it's a 1 MW site." That sentence is not enough to price anything, and this is the single most common way a solar bid goes wrong before it starts.
Why the array runs bigger
Arrays are deliberately built bigger on the DC side than the inverters can pass on the AC side. It's called the inverter loading ratio, and it isn't sloppiness, it's design: modules got cheap, and an oversized array keeps producing through mornings, evenings and overcast hours, at the cost of the inverter clipping the peak on the brightest days. NREL models utility-scale PV at a loading ratio of 1.34 in its Annual Technology Baseline.
What a third more means
Follow that through. If your 1 MW is 1 MWac, the array standing behind it is closer to 1.3 MWdc. That's roughly a third more modules to buy, a third more racking to install, a third more clamps and rails and fasteners, and a third more mounting labor. None of that shows up if you priced the AC figure and assumed it described the hardware.
So the first question our estimator asks is which rating the number refers to, and we confirm it against the module and inverter schedules rather than assuming. It's a short conversation that regularly moves a bid by a quarter.
Rock at Four Feet Changes Everything
The other half of a solar estimate has almost nothing to do with electricity. It's a foundation problem, and it gets decided by a geotechnical report rather than by the one-line diagram.
On a ground mount, piles get driven to whatever depth the soil demands, and the way you find that out is a pull test: pull on a pile at a given embedment and measure what it takes to move it, repeated at different depths and different spots because soil is not uniform across a field. Hit rock or ledge before design depth, which the trade calls refusal, and driven piles stop being an option at all. You move to helical piles, ground screws or ballasted concrete, and the foundation line changes shape entirely.
| Mounting type | What decides it | Cost impact on the bid |
|---|---|---|
| Driven pile | Soil with enough resistance, confirmed by pull tests | The cheapest foundation when the site allows it, and fast to install |
| Helical or ground screw | Softer soils, or refusal too shallow for driving | More hardware and slower installation, priced per pile rather than per foot |
| Ballasted ground | Sites where nothing can be driven, or where penetration isn't permitted | Concrete and haulage become a real line, and site access starts to matter |
| Rooftop, ballasted or attached | Wind uplift under ASCE 7 and what the roof structure can carry | Ballast adds dead load; attachment adds penetrations and roof coordination |
None of that is knowable from the array layout. It comes out of borings, pull tests and a wind calculation, and on a lot of projects those aren't final when the bid is due. We price against what exists, state the assumption plainly, and flag the line as the one most likely to move.
Nobody Prices Both Halves Well
Here's the pattern we see. An electrical contractor sends us a solar package and their DC side is immaculate: string sizing, conductor runs, combiner counts, all of it right. The racking and foundations are a lump sum with a shrug behind it. A civil contractor sends the same project and it's the mirror image, piles counted properly and the electrical scope carrying a placeholder.
That's not carelessness. It's that solar sits across two trades, they price at different labor rates, and most estimators are genuinely expert in one of them.
Because we're a cost estimating group that prices every trade, the DC side and the foundation side each go to an estimator who works that trade. We take off both and keep them apart on the deliverable, so you can see which half is carrying the risk and check the half you already know against your own numbers. If the ground-mount site also needs access roads, trenching or grading, that's earthwork under Division 31 and prices on an excavation estimate rather than getting buried in ours. The pile is ours. The dirt around it isn't.
Who Carries the Solar Package
On most solar jobs the scope is split across more than one company, and each of them needs the number for a different reason.
EPC contractors
Responsible for every line of the system, and checking an outside count against their own.
Electrical subcontractors
Confident on the DC and AC side, less so on piles and racking.
Solar installers
Who would rather be installing than spending an evening on a takeoff.
General contractors
Who inherited a solar scope with the site package and have nobody in-house who prices arrays.
Developers and asset owners
Pricing a site before the design is locked.
We work for whoever is bidding the job. If you're a homeowner wondering what panels would cost on your house, we're genuinely not the right call, and a local installer will serve you better.
Measured Off the One-Line and the Array Layout
We settle the nameplate
DC or AC, confirmed against the module and inverter schedules before a single quantity gets counted.
We count modules and strings off the array layout
Module type and wattage, row by row, with the string configuration that determines the DC collection.
We take off racking and foundations against the geotech
PlanSwift and Bluebeam handle the layouts; the foundation type comes from the borings and pull tests where they exist, and from a stated assumption where they don't.
We price the two halves separately
Electrical and structural at their own labor rates through RSMeans data, so neither one hides inside the other.
Our Fee Ignores the System Size
The fee is flat, $100 to $5,000 by scope, and it's set before we open your files. A 20 MW site doesn't cost more to estimate than a 2 MW site of the same complexity. Megawatts don't enter into it. The fee follows how many distinct things there are to take off.
Turnaround and accuracy
We deliver in 18 to 24 hours. The 97% figure comes from measuring finished work across the whole estimating unit, not from marketing. Send something during working hours and you'll hear back inside 20 minutes, usually with a question about which nameplate you meant.
The deliverable
What lands in your inbox: a solar takeoff carrying module and string counts off the array layout, racking and foundations quantified by type, inverters and DC collection listed separately, the AC and interconnection scope on its own lines, and the electrical and structural halves kept apart so you can check either one. Master Estimating works all 50 states, and wind zone, snow load and local interconnection practice all shift the number depending on where the site sits.
Utility Scale Down to a Single Roof
Solar shows up at every scale: residential, commercial, and industrial rooftops, plus utility-scale ground mount on the civil side. Between the smallest of those and the largest, the engineering barely overlaps and neither do the cost drivers.

Rooftop arrays on homes and small multi-family, where attachment detail and roof condition drive the labor.

Flat-roof arrays, carports and canopies, where ballast versus attachment and the canopy steel set the cost.

Large rooftop and behind-the-meter ground mount at warehouses and plants, usually with a heavier interconnection scope.

Utility scale ground mount, where rows, trackers and pile counts run into the thousands and the geotech governs everything.
What a Dollar-Per-Watt Number Leaves Out
The nameplate settled first
DC or AC, confirmed, because a third of the hardware hangs on the answer.
Racking counted by row and module
Not estimated as a percentage of the module cost.
Foundations priced to the actual soil
With the assumption stated wherever the borings aren't back yet.
Both halves visible
Electrical and structural apart, so neither hides the other's risk.
Interconnection scoped to a real endpoint
We say where our scope stops rather than leaving it vague.
Ready for a lender or an EPC to pick apart
Every quantity traceable to the layout, the schedule or a stated assumption.
Frequently Asked Questions
Your quote says 1 MW. Which one do you need from me?
+
Ideally both, and if you only have one, tell us which it is. The DC and AC ratings of the same project differ by roughly a quarter to a third because of the inverter loading ratio, so the two describe different amounts of hardware. We confirm it against the module and inverter schedules before counting anything.
We don't have a geotech report. Where does that leave the foundation line?
+
Priced, with the assumption written down. We'll price against the most likely foundation type for the soils in that area and flag the line clearly, because a refusal condition can change the foundation family completely. When the borings and pull tests land, we revise that line rather than rebuilding the estimate.
Is the racking inside your takeoff?
+
Yes, and kept separate from the electrical scope on the deliverable. That split is deliberate: solar spans two trades priced at two labor rates, and blending them is how one half ends up hiding the other's risk.
Where exactly does your scope end on the AC side?
+
At the point of common coupling, and we state it on the estimate. Past that you're into the building's own distribution, which is a different scope on a different page.
Can you work from a preliminary layout?
+
Yes. Early-stage layouts are normal on solar and we'd rather price twice than pretend a concept-level array supports a firm number. Send what exists, and we'll mark which quantities are firm and which are carrying an assumption.
How do trackers change the count?
+
Substantially. Trackers change the pile count, the row spacing and the mechanical scope, so they're taken off as their own configuration rather than adjusted off a fixed-tilt number.
Content reviewed and updated: November 4, 2026
Get Your Solar Estimate
Send the array layout, the one-line diagram, and the module and inverter cut sheets. The geotech report too, if you have it. You'll get module and string counts off the layout, racking and foundations quantified by type, and the electrical and structural halves priced apart.
Back in 18 to 24 hours. If you're not sure which nameplate your drawings are quoting, send them anyway and that's the first thing we'll tell you.