Doors & Windows Estimating Services
Counting the doors is the easy half of doors and windows estimating services: every opening on the door schedule carries a hardware set code, and what that code actually contains sits in a separate document. We expand every set, and take off frames, windows, storefronts and glazing alongside them. The fee is flat, $100 to $5,000 once we've seen the opening count, then 18 to 24 hours to the finished package at the 97% accuracy we track on every job. Questions get answered inside 20 minutes.
- Both schedules worked against each other, opening by opening
- Hardware priced piece by piece, never as a set allowance
- An openings estimator writes back within 20 min
Both schedules worked, package back
Accuracy, tracked
Openings, coded on every takeoff
Reply from an openings estimator
The Package Is Wider Than Doors and Windows
The trade is called doors and windows, and the spec calls it Openings, CSI Division 08. Either way the scope is wider than the name suggests: swing doors and their frames, overhead and coiling doors, all the door hardware, windows, storefront systems, curtain wall, and the glazing in all of it. Interior and exterior get counted separately, because they price differently and they usually get bought from different suppliers.
Worth saying what doors and windows estimating services aren't, because searching for them turns up plenty of software and plenty of suppliers. We're neither. We don't sell takeoff tools and we don't quote you the doors themselves. We price what the drawings and schedules specify, so you can go and bid it or buy it.
Master Estimating works with door and glazing subcontractors, general contractors carrying an openings package, builders, and architectural firms checking a design against a budget.
The Door Schedule Won't Price the Door
Here's the part that catches people, and it's specific to this trade.
A door schedule is a table of every opening in the building. Each row gives you an opening number, a size, a door type, a frame type, a fire rating where one applies, and then a short code in the hardware column. Something like HW-4. That code is the whole ballgame, and the schedule doesn't tell you what it means.
What HW-4 means lives in the hardware schedule, a separate document, usually written by the hardware supplier in the Door and Hardware Institute's vertical format. Open it up and a single set expands into a list: hinges, a lockset or an exit device, a closer, stops, seals, a threshold, sometimes a coordinator or an automatic operator. So one row on the door schedule becomes six, eight, ten priced components on your bid.
Side by side, the split looks like this.
| What the door schedule gives you | What only the hardware schedule tells you |
|---|---|
| The opening number and its location | Hinges, by count, size and type |
| Door size, material and type | A lockset or an exit device, by function |
| Frame type and material | A closer, where the opening needs one |
| Fire rating, where one applies | Stops, seals, sweeps and the threshold |
| A hardware set code, and nothing else | Everything that code actually stands for |
So an openings takeoff can't be done off one document. Count the doors and you've counted doors. Expand the sets and you've priced the job. We work both schedules against each other, opening by opening, and where the two disagree, and they do disagree, we flag it rather than pick one.
Same Door, Different Set
Two openings can be the same size, same material, same leaf count, and carry completely different hardware. What moves them apart.
Fire rating
A rated opening needs rated hardware, self-closing and positive-latching, and the label requirements follow through to the frame.
Egress and life safety
A stairwell door on an egress path gets an exit device, not a lockset, and a double-egress pair doubles most of the count.
ADA and accessibility
Operating force, hardware height, and lever versus knob are specification items, not preferences.
Acoustic requirements
Sound-rated assemblies bring seals, sweeps, and sometimes a different door core entirely.
Leaf count
Hinges are counted per leaf, so a pair isn't two singles, it's its own arithmetic.
Finish
The BHMA finish code on the schedule, something like US26D or US32D, changes the price of every piece it applies to without changing the count at all.
None of that shows up if you price by door type. All of it shows up if you read the set.
Card Readers Belong to Another Division
One boundary worth stating plainly, because it's where openings packages usually leak.
The moment an opening gets electrified, power transfers, an electrified exit device, a card reader, a door position switch, the low-voltage and power side of it stops being Division 08 and lands in Division 26 and 28. We quantify the opening hardware and flag every electrified opening on the takeoff so nobody assumes it's covered. If you want that side priced too, we handle it as electrical estimating on the same job rather than sending you elsewhere.
Nothing Bundled Into Doors and Hardware
A line reading "doors and hardware, lump sum" is where margin goes to die. The material takeoff comes back split out.
Openings by type
Every opening counted and grouped by door type, material, and size, interior and exterior kept apart.
Frames
Hollow metal, wood, aluminum, counted with the door but priced on their own, since they often ship from a different source.
Hardware, expanded by set
Every set opened up to its component parts and priced piece by piece, not carried as a set allowance.
Windows, storefront, and curtain wall
Units and systems by type and size, with the glazing quantified against the specified makeup.
Labor cost
Hours priced to the work, because hanging a hollow metal door in a rated frame and setting a storefront system are not the same install.
Cost summary
Material, hardware, glazing, and labor rolled up, with every exclusion written down where you can see it.
Where the schedules left something ambiguous, you'll see what we assumed, on the line it affects.
Which Openings Show Up Where
The building type decides which half of Division 08 dominates. Houses are mostly windows and a handful of entry doors. Commercial work is hollow metal, storefront, and hardware sets that run to several pages. Industrial buildings turn on overhead and coiling doors. Public work brings security hardware, heavy traffic, and specification requirements the private side rarely sees.

Window counts and a short door list, where the schedule is often just a plan callout.

Storefront, hollow metal, and the longest hardware schedules of any project type.

Overhead and coiling doors, priced by opening size and cycle duty rather than by leaf.

Egress hardware and security specifications written tighter than private work.
Everyone Working From the Same Two Schedules
Openings get bid, bought, and installed by different people, and they all end up reading the same two documents.
Door and glazing subcontractors
Send the set over because pricing hardware from memory is how a good bid turns into a bad job.
General contractors
Hand over the openings package because it's a lot of small line items that add up fast and nobody wants to own it.
Builders and developers
Want the number early, before a hardware specification locks in a cost nobody priced.
Architectural firms
Use our expansion as a check that the sets they specified actually match the doors they scheduled.
If the door schedule is sitting on your desk and the hardware schedule is somewhere in the spec book, that's the job.
Reading Two Documents at Once
Openings and glazing get measured off the plans and elevations in PlanSwift and Bluebeam, with Stack picking up whatever file format the architect sent. The schedules themselves get worked line by line against each other, which is reading rather than measuring, and it's where most of the time on an openings takeoff actually goes. RSMeans handles the money side once the counts are settled.
The whole thing carries its CSI Division 08 coding, which matters the moment an openings package has to sit inside a much larger bid. We run an estimating office covering every trade on the drawings, so the openings package doesn't have to be the only thing we look at.
Flat Fee, Set Before We Open the Drawings
$100 to $5,000, quoted up front against the scope, not billed by the hour. Openings packages vary more than most, a house with twelve windows and a hospital wing with three hundred rated openings are different jobs, so the fee gets set once we've seen what's there. Turnaround is 18 to 24 hours, accuracy holds at 97% across everything we deliver, and questions on the schedules get answered within 20 minutes during working hours.
Hardware specifications, fire codes, and accessibility requirements are enforced locally, and we account for that per project rather than pretending it's uniform. We estimate in all 50 states. If the openings package goes well, multi-division estimating on the rest of the job is the usual next conversation.
Frequently Asked Questions
Can we get a price off the door schedule alone?
+
Yes, with a caveat we'll state on the takeoff. Without the hardware schedule we price the sets against what the door types, ratings, and functions imply, and we mark every assumption. Send the spec section when it turns up and we'll firm it.
Is hardware priced as a set allowance or broken out?
+
Broken out. Every set gets expanded to its component pieces, hinges, closer, lockset or exit device, seals, threshold, and each is priced on its own line. A set allowance hides exactly the things that move the number.
Do storefront and curtain wall come under this scope as well?
+
Both are in. Storefront systems, curtain wall, and the glazing makeup specified for them get quantified alongside the doors and windows, since they sit in the same division and usually the same bid package.
What happens when the door schedule and the hardware schedule contradict each other?
+
We flag it rather than quietly choosing one. Contradictions between the two are common, and the resolution is a decision for you or the architect, not something an estimator should bury in a number.
Our openings have card readers and electric strikes. Where does that land?
+
The opening hardware is ours. The power and low-voltage side belongs to Division 26 and 28, so we quantify it, flag it, and price it separately if you want the electrical scope covered too.
When does the turnaround clock actually start?
+
18 to 24 hours, and the clock starts when both schedules are in our hands rather than when you first get in touch.
Content reviewed and updated: November 4, 2026
Get Your Openings Estimate
Send the plans and both schedules, and you'll get every opening counted, every hardware set expanded to its parts, and the glazing quantified against what the spec calls for, inside 18 to 24 hours. No commitment to get the number, and no obligation after you've read it.
Every set expanded to its pieces, every contradiction between the two schedules flagged.