Preliminary Estimating Services
Home › Preliminary Estimating Services

Preliminary Estimating Services

ASPE / AACE-Aligned Preliminary Estimators Priced Against Projects That Actually Got Built Location and Time Adjusted, Not Guessed A Basis of Estimate You Can Argue With

Preliminary estimating services put a cost on a project before anything exists to measure. Our services take a comparable project that got built. We adjust its real cost for where yours is going, when it will be built, how big it is and how it's specified. You get the number and the list of what we adjusted. The estimate returns in 18 to 24 hours at 97% accuracy, tracked. Pricing is $100 to $5,000, flat fee per project, set by scope rather than construction value.

  • The comparables named, with their type, size, location and year
  • Every adjustment listed separately instead of folded into one figure
  • You don't need a drawing set. You need the right comparable, and finding it is our job.
(747) 444-4560
Three Things Is Enough

What you want built, its approximate square footage, and the market it sits in. Anything drawn is a bonus here, never a requirement.

18–24HR

Three inputs in, number out

5ADJUSTMENTS

All of them shown separately

97%

Tracked, never a quoted band

20MIN

While the decision is still open

What This Is

The First Estimate a Project Gets

Preliminary estimating services start from the real cost of a comparable completed project and adjust it for location, time, size, specification and site conditions, which gives a project its first construction cost while there is nothing to measure yet.

Every project gets one of these, whether anybody calls it that or not. Somebody has to say roughly what the thing will cost before anyone commits to drawing it properly, and that figure decides whether the project continues. It's the most consequential number on the whole job.

We work from any of these inputs.

A building type, a gross square footage and a location

The minimum we need to start.

A conceptual sketch, a massing study or a site plan

Useful when one exists.

An incomplete design at any stage of finish

A set that stops halfway counts.

A feasibility study

A feasibility study needs a construction cost line to sit under it.

A written program with no drawings at all

A program with no drawings is a normal starting point and workable.

A comparable project of your own

A comparable you'd like us to price against.

Renovation and adaptive-reuse work

The existing building is the hardest input.

Where the Number Starts

We Price It Against Buildings That Got Built

A preliminary estimate contains no measurement, and at this stage nothing exists to measure.

A project with drawings to count calls for a measured takeoff instead, and that gives a better number. At this stage the drawings either don't exist or don't say enough to count anything off, so precision has to come from somewhere else.

Precision comes from other buildings. Real ones, that got built, that cost what they cost, where the number is settled rather than predicted. Our job as an early-stage estimating group is to pick the right one and carry its cost across to yours.

A completed low-rise office building with a blue-tinted reflective glass curtain wall and white spandrel panels
A finished building has a settled cost. That is what makes it worth pricing against.

Carrying a cost across sounds loose until you look at what it involves. A building in Boise and the same building in Boston are different numbers. The same building in 2021 and in 2026 are different numbers. A 40,000 square foot version of a 12,000 square foot building isn't three and a third times the price. Each of those gaps is a named adjustment with a published basis, and the honest measure of a preliminary estimate is how carefully they were applied.

Picking the Starting Point

Choosing Which Project to Price It Against

Before any of that, somebody has to choose which building to start from. Pick badly and no amount of careful adjusting saves it.

So the selection gets its own attention, and it runs roughly like this.

01

Match the type and the use, not the shape

A three-story walk-up and a three-story medical office share a massing and almost nothing else. Use drives structure, systems, and finish, and those are most of the cost.

02

Match the construction, not the description

"Warehouse" covers a tilt-up concrete box and a pre-engineered metal building. Those are different numbers before anyone talks about location.

03

Check the comparable is actually settled

A project still in progress has a forecast, not a cost. We price against jobs that finished and got reconciled.

04

Use more than one where we can

A single comparable carries whatever was odd about that particular job. Two or three, adjusted separately and compared, tell you whether the answer is stable.

05

Say which ones we used

The deliverable lists them by type, size, location and year, so the reasoning is visible and open to challenge.

Naming them is the part that turns a figure into something checkable. An estimate with its comparables hidden is just a number somebody asserted.

Five Adjustments

Five Things Between That Building and Yours

The adjustments are where the work sits once a comparable is settled. Five of them matter, and we show you each one rather than folding them into a single figure and asking you to trust it.

The adjustmentWhat it corrects forWhere the number comes from
LocationThe comparable was built somewhere else, and construction costs aren't nationalThe RSMeans City Cost Index, published location by location against a national average set at 100
TimeIt was built at a different point in the market, and material and labor have moved sinceThe same index, which carries a dated base, so escalation between then and your build window is a lookup rather than a guess
SizeCost per square foot doesn't scale in a straight line, so a bigger version of the same building isn't a proportional multipleOur own history of 7,100+ completed projects
SpecificationSame building type, different finish and systems levelThe stated spec level of both projects, written down so the assumption stays visible
Site and conditionsWhat the comparable's site demanded that yours won't, or the reverse. Sloped ground, poor soils, a live building next doorWhatever site information exists, and a named assumption where none does

Location and time are the two we are most rigorous about, because the location factor and the time base both come off a published index rather than out of anybody's head. Specification is the one that quietly wrecks numbers, so it is the one to ask any estimator about first.

On Precision

We Won't Quote You an Accuracy Percentage

A table of accuracy bands, with a percentage for each stage, looks rigorous. We're not going to publish one, and here's the reasoning.

An accuracy percentage

Accuracy percentages describe how wrong an estimate of a given type is expected to be. They aren't a measurement of anybody's actual work, they go unchecked, and quoting one at you implies we know something about your project that we don't. Our 97% accuracy figure is a different thing: it's tracked across the work we've priced.

A basis of estimate

What we give you instead is a basis of estimate. It names the comparables, states the assumptions in full, lists the adjustments applied and flags what moves the number most if it proves wrong. If you want to know how much confidence to place in a rough order of magnitude figure, that document tells you far more than a percentage does, because it shows its reasoning for you to argue with.

Ask any preliminary estimator what they priced it against. If the answer is a percentage rather than a project, you've learned something.

Who Asks First

Before Anyone Has Committed a Dollar

Preliminary numbers get used by people deciding whether something happens at all, which is a different room from the one a bid gets read in.

A fenced vacant grass lot on a city block with older masonry buildings standing behind it
At this point the only thing that exists is the question of whether to build anything.

Developers and owners

Testing whether a site, a program or an acquisition is worth carrying any further.

Investors and lenders

Who need a construction cost line under a proposal before they'll fund the design work that produces a real one.

Architects

Asked at the first meeting what it'll cost, who'd rather not answer from memory.

General contractors

Giving an early number to a repeat client, where being roughly right and honest about it protects the relationship.

Public bodies and institutions

Taking a project to a board or a council for approval, where residential, commercial, and industrial lines all have to stand on one basis.

Anyone who's been handed a figure

And wants a second one built independently before they act on it.

Different decisions, same need: a number with its working shown, produced fast enough to be useful while the decision is still open.

The Price of Finding Out

A Small Cost to Test a Big One

Scope decides the fee, from $100 to $5,000, and it holds once agreed. A single-building feasibility number sits at the bottom of that. A multi-building program with several comparables to reconcile sits higher. The fee doesn't move with the construction value, which is an odd way to price the one estimate that exists to test whether the construction value is bearable.

Turnaround

We work to 18 to 24 hours. On a feasibility question speed matters, because these decisions get made in meetings that are already scheduled, and a number that lands afterwards is worth almost nothing.

What you receive

Master Estimating hands you the estimate, the basis of estimate behind it, the comparables named with their type, size, location and year, the adjustments listed one by one, and a short note on which assumption hurts most if it's wrong. Broken to CSI level where the information supports it, held higher where it doesn't.

Coverage

All 50 states are covered. We reply within 20 minutes during working hours. When a project clears this stage and moves into design, cost and budget control picks up from the same numbers, so nothing gets re-derived from scratch.

Mismatched Comparables

Bad Comparables, Expensive Surprises

The comparable was chosen on the wrong axis

Matched on size or shape rather than on use and construction. The mistake is invisible unless the comparable is named.

Nothing was adjusted for time

A project from three years ago priced as though it were current, in a market that has not been still. The fix is easy and easy to forget.

The location adjustment was skipped

A national average applied to a market that isn't average.

The spec level never got stated

Two buildings of identical type and size differ enormously when their finish and systems levels differ, and if nobody wrote down which level was assumed, nobody knows whether the number fits.

A single comparable carried the whole estimate

Every completed project has something odd about it. One of them, unchecked, imports that oddity straight into your figure.

The number outlived its purpose

A figure produced to test feasibility gets quoted six months later as though it were a budget. That isn't an estimating failure, it's a labeling one, and the basis of estimate exists to prevent it.

This is deliberate work, not a quick favor

9+ years, 7,100+ completed projects, ASPE and AACE-aligned estimators. Early numbers get the same people as the detailed ones.

Questions

Frequently Asked Questions

Is a building type, a size and a location too little to work with?

+

No. A building type, a size and a location are the standard starting point for this service, and the method is built to run on exactly that much. We'll find comparables that match on use and construction, adjust them, and hand you the estimate with every assumption written down. More information tightens it, and a site plan or a conceptual sketch helps, but those three inputs are enough to produce a figure to act on.

Which projects will you price ours against?

+

Ones that match on use and construction type, that are close enough in size to adjust sensibly, and that are finished and reconciled rather than still running. We name them in the deliverable with their type, size, location and year, so the choice is yours to judge.

What is the difference between a preliminary estimate and a detailed estimate?

+

A preliminary estimate prices a project against completed comparables with no measurement, which is why it works before drawings exist. A detailed estimate measures quantities off a drawing set and prices each one, so it needs the design to exist. The preliminary figure tests whether a project is worth drawing, and the detailed one prices what was drawn. When a project moves into design, cost and budget control picks up from the same numbers.

Our site is difficult. Does that break the method?

+

A difficult site doesn't break the method, it just becomes the assumption that carries the most risk, and we say so on the front page. Bad soils, a steep slope or a tight urban site all move a number. Where there's no geotechnical information yet, we put the assumption on the page in words instead of letting it disappear into the number.

Can I use this number to raise finance?

+

Yes. People do, and the basis of estimate is written with that reader in mind. What it won't do is behave like a tendered price, and if your lender needs something firmer we'll name the drawings that get you there rather than dressing this one up.

We got a much lower figure from someone else. Who's right?

+

Compare the two bases rather than the two totals, and ask what each was priced against and what each adjusted for. Spec level and a missing location adjustment are the first two places to look, and with both sets of workings on the table the gap has somewhere to start.

Content reviewed and updated: November 4, 2026

Your First Number

Get a Number You Can Take to a Board

Tell us the building type, roughly how big, and where. If a conceptual sketch or a program exists, send that too, and if it doesn't, that's the normal case rather than a problem.

We'll price it against completed projects, list what we adjusted and why, and give you a figure with its working attached in 18 to 24 hours. Flat fee, $100 to $5,000 by scope, in all 50 states.

Send the three things you know

Any early number comes with the projects behind it. If whoever wrote it names none, they haven't done the work, and our estimators will tell you exactly which buildings sit behind your number.