Roofing Estimating Services
Home › Roofing Estimating Services

Roofing Estimating Services

ASPE / AACE-Aligned Roofing Estimators Waste Priced to Roof Complexity, Not a Flat Rate Steep-Slope Shingle & Low-Slope Membrane, Both Covered Tear-Off and Recover Scopes Both Counted

A roofing estimate starts with squares and pitch, then prices waste to your roof's actual complexity, cuts, valleys, and penetrations, not a flat percentage. We cover steep-slope shingle work and low-slope membrane work, tear-off or recover, for a flat fee of $100 to $5,000 by scope, back in 18 to 24 hours at 97% accuracy.

  • Waste counted to your roof, never a flat percentage
  • Steep-slope and low-slope, both covered
  • A roof estimator replies in 20 min
(747) 444-4560
Send Your Roofing Project
18–24HR

Squares counted, pitch and waste priced

97%

Accuracy, tracked across completed projects

7,100+

Completed projects, 9+ years

20MIN

Reply during working hours

The Measurement

How We Measure a Roof

A roofing estimate starts with squares, the trade's own unit, each one covering 100 square feet of roof plane. We measure them off the plans or a site walk and multiply by pitch, since a steep roof takes longer to work and burns more material doing it than a flat one. Plenty of estimators can hand you a square count. What actually separates a real roofing estimate is whether the waste factor gets priced to the roof's own complexity, cuts, valleys, dormers, penetrations, or gets a flat percentage slapped on regardless of shape. We price waste to the roof in front of us, never a rule of thumb.

A simple gable roof with two planes and one ridge doesn't waste material anywhere near the rate a roof with six valleys, three dormers, and a chimney does, and a flat waste percentage either overpays on the simple roof or underorders on the complex one. We estimate residential, commercial, and industrial roofing alike, and every roof gets its own complexity read before a waste number ever goes on the sheet. That's the whole reason to bring in Master Estimating's estimating team rather than eyeballing squares off a satellite photo.

Two Different Takeoffs

Steep-Slope vs. Low-Slope: Two Different Takeoffs

Steep-slope and low-slope roofs aren't the same job to measure. Different materials, a different unit of measure, usually a different crew entirely.

Steep-Slope, Shingle-Family

Asphalt shingleMetal, standing seamTileWood shakeSlate

Steep-slope work gets measured in squares off the roof plane, with pitch as a direct cost multiplier.

Low-Slope, Membrane

TPOEPDMPVCModified bitumenBuilt-up (BUR)

Low-slope work gets measured by membrane area and seam length instead, pitch barely factors in.

Spray foam and green roofing come up occasionally too, and we price those the same way, on the assembly's own terms, not forced into a shingle-shaped estimate.

Roof-to-wall flashing is where this scope ends and another one begins. Foundation walls, below-grade slabs and planters run on different materials and a different failure mode, so they price as a waterproofing estimate.

Before We Count Anything

Tear-Off or Recover

Before we count a single shingle, one decision changes everything else about the number: do we tear the old roof off, or build over it.

Tear-off

Removes the existing roof down to the deck. Resets the material count from zero, adds disposal and any deck-repair line items, and is the right call once two layers are already down or the deck needs a real look.

Recover

Installs the new roof over one existing layer where code allows. Skips tear-off labor and disposal cost, but it isn't right for every roof, and we won't recommend it just because it prices lower.

We ask this before we price anything, not after, because it changes the square count, the waste, and the disposal line all at once. Skip the question and the estimate is guessing at a scope nobody's confirmed yet.

Line by Line

What Gets Counted

Not "materials and labor." Here's what's actually on the sheet.

Field shingles

The main coverage area, counted by square, not estimated by eye.

Starter course

The first row along the eave, priced separately from field shingles.

Hip and ridge shingles

Measured by linear foot along every hip and ridge on the plan.

Underlayment

Synthetic or felt, sized to the full roof area including waste.

Ice and water shield

Counted at eaves, valleys, and penetrations, wherever code and climate call for it.

Drip edge

Linear footage around the full perimeter of the roof.

Flashing

Chimneys, walls, skylights, and valleys, each a real line item, not folded into "trim."

Vents and fasteners

Counted to the actual roof, not a generic per-square allowance.

How It Runs

How We Run a Roofing Takeoff

Send your plans or scope

Send plans and elevations when you've got them; a few photos and a rundown of the roof works fine when you don't.

We confirm assembly and tear-off or recover

An estimator confirms shingle-family or membrane, and whether this is a tear-off or a recover, before anything gets priced.

We measure squares, pitch, and waste

On-screen in PlanSwift or Bluebeam, plane by plane, with waste priced to this roof's own complexity.

Your priced roofing estimate lands

The squares get added up twice: once during the takeoff, once before the file ships. Pitch, waste, and every material line come back to you in 18 to 24 hours as an Excel sheet or a marked-up set of plans.

Four Verticals

Residential, Commercial, Industrial and Civil Roofing

A home re-roof, an occupied commercial membrane replacement, an industrial metal roof, and a public building's roof each price differently, and each goes to an estimator who handles that kind of roof regularly.

Workers installing synthetic slate roofing underlayment on a brick house
Residential

Shingle re-roofs and new construction, priced by square and pitch.

Aerial view of a low-slope membrane roof on a commercial building complex
Commercial

Low-slope membrane replacement, usually phased around a building that can't close for the work.

Corrugated metal roof over an industrial factory at sunset
Industrial

Large-footprint metal and membrane roofs over plants and warehouses.

Aerial view of a courthouse's steep roof on a civil, public-sector building
Civil & Public

Schools, municipal buildings, and public facilities, priced to code, not curb appeal.

Toolset

Estimating Software & Standards We Use

Four tools, run in-house, turn squares and pitch into a number you can trust, not the aerial-measurement apps the field likes to sell you.

TakeoffPlanSwift

Measuring roof planes and pitch off the plans or a marked-up site sketch.

MarkupBluebeam

Marking up valleys, hips, and penetrations right on the drawing set, plane by plane.

TakeoffStack

Where a multi-building membrane job needs several estimators working the same takeoff at once.

Cost dataRSMeans

Roofing material and labor costs for the region the job sits in, organized under CSI Division 07, Thermal and Moisture Protection, shingle and membrane both.

A single-family re-roof and a multi-building membrane replacement get measured with the same four tools; a square is a square whether it's over a living room or a loading dock.

What Moves the Price

What Changes the Number

The flat fee for a roofing estimate runs $100 to $5,000, priced to scope. On a roof, scope tracks three things.

Roof complexity

Cuts, valleys, dormers, and penetrations drive the waste number up, a simple gable roof drives it down.

Assembly type

Steep-slope and low-slope price differently, different materials, different labor rates.

Tear-off or recover

Tear-off adds disposal and deck-repair line items a recover skips entirely.

You'll have it back in 18 to 24 hours, squares and pitch stated plainly, waste priced to your roof, as a bid-ready Excel file, a PDF, or both. A roofing estimator replies within 20 minutes during working hours to confirm assembly type and the tear-off-or-recover call before pricing starts, because every estimator at our estimating firm runs the same complexity read, never a shortcut version of it.

Why Contractors Trust Our Roof Takeoffs

A Flat Waste Percentage Isn't an Estimate

Squares are the easy part. What we get right, and a lot of quick quotes don't, is everything squares alone can't tell you.

Waste priced to your roof

Never a flat percentage applied the same way to a simple gable and a six-valley roof.

Every assembly counted

Steep-slope shingle work and low-slope membrane work, measured on their own terms.

Tear-off and recover, priced correctly

Confirmed before pricing starts, not assumed.

ASPE / AACE-aligned estimators

Real credentialing behind every count, not a self-declared title.

18 to 24 hour turnaround

Faster than the field's usual 24-to-48-hour standard.

97% accuracy, tracked

Measured against our own delivered estimates, not a marketing number.

Questions

Frequently Asked Questions

How do you measure a roof for an estimate?

+

We measure a roof in squares, 100 square feet of roof plane at a time. First, we take the square count off the plans or a site walk. Second, we apply pitch as a real cost multiplier. Lastly, we price waste to the roof's own complexity, cuts, valleys, and penetrations, rather than a flat percentage.

Do you cover both steep-slope and low-slope roofing?

+

Yes. Steep-slope shingle, metal, tile, wood shake, and slate work, and low-slope TPO, EPDM, PVC, modified bitumen, and built-up membrane work, each measured on its own basis.

Do you price tear-off and recover differently?

+

Yes, and we confirm which one applies before pricing anything. Tear-off adds disposal and deck-repair line items a recover skips, so the two scopes never share a number.

What's the best roofing estimating software?

+

PlanSwift and Bluebeam handle the squares-and-pitch measurement, Stack takes on larger multi-building membrane packages, and RSMeans prices material and labor under CSI Division 07. These are tools we operate ourselves, not the aerial-measurement apps some competitors sell or compare.

How long does a roofing estimate take?

+

18 to 24 hours once we have your scope confirmed, whether it's a single-family re-roof or a multi-building membrane replacement.

What's included in the deliverable?

+

A bid-ready breakdown in Excel, PDF, or both.

  • Squares and pitch
  • Waste Priced to this roof's own complexity.
  • Every material line Field shingles or membrane down to fasteners.
  • A marked-up plan set When it helps the crew read the takeoff.

Content reviewed and updated: November 4, 2026

Get Started

Get Your Roofing Estimate Started

A simple re-roof and a six-valley, multi-dormer job don't land at the same number. That's exactly why the fee runs $100 to $5,000 by scope. Send your plans or scope and we'll tell you where yours actually lands.

We'll confirm the assembly type, settle tear-off or recover, and count squares, pitch, and waste the way 7,100+ completed projects across all 50 states have taught our estimating team to do it, not guessed off a satellite photo.

A roofing estimator replies within 20 minutes during working hours, and you'll have the complete numbers in 18 to 24 hours, early enough to shape the bid instead of scrambling to match it.

Send Your Roofing Project

There's no cost or obligation to send us your roof scope. Not sure if your roof is a tear-off or a recover? Send a few photos and we'll tell you.