Framing Estimating Services
Framing estimating services price wood and metal framing together, counting the studs, plates, headers, joists, rafters, trusses and connectors piece by piece. Our services return the estimate in 18 to 24 hours at 97% accuracy, tracked. Pricing is $100 to $5,000, flat fee per project, set by scope. Send the plans over. We reply within 20 minutes during working hours.
- Wood and metal framing counted on their own terms
- Every stud, plate, and connector counted, not estimated
- A framing estimator replies in 20 min
Piece-counted and priced to the market
Accuracy, tracked across completed projects
Completed projects, 9+ years
Reply from a framing estimator
One Estimate, Two CSI Divisions
Framing estimating is the piece of your bid that quantifies and prices the structural skeleton of a building, the studs, plates, headers, joists, rafters, beams, trusses, and connectors that everything else in the building hangs off of. It's technically two trades wearing one hat. Wood framing falls under CSI Division 06, rough carpentry. Metal and steel framing falls under Division 05, cold-formed metal framing. We staff both, because some jobs need both. What sits outside it is the finish work: cabinets, trim and paneling are priced as cabinetry and millwork estimating, a different scope on the same drawings.
That's not a small distinction for your bid. Take a multifamily project with wood exterior walls and cold-formed steel interior demising walls, and a commercial build that goes steel top to bottom. A residential remodel is almost always wood. Send us the set and we'll tell you which division, or which mix of both, your project actually falls under, then price it that way instead of forcing one method onto a job that needs two.
As a full-service construction estimating group, we don't stop at lumber and steel counts. Framing rarely gets bid on its own, it sits inside a larger package with concrete, roofing, and finishes, and our estimators price the piece you need without making you coordinate separate vendors for one bid.
Wood Framing vs. Metal/Steel Framing
Same job, two different material worlds. Here's how we split it.
Wood framing (CSI Division 06)
Studs, plates (top and bottom), and headers. Joists, rafters, and beams. Trusses, engineered or site-built. Sheathing and fasteners sized to the assembly.
Metal/steel framing (CSI Division 05)
Cold-formed steel studs and tracks. Structural connectors, clips, and hangers. Load-bearing versus non-load-bearing gauge and spacing. Fasteners rated for steel-to-steel and steel-to-substrate connections.
Wood and steel don't just price differently, they move on different markets entirely. Lumber tracks the commodity lumber market. Steel tracks steel mill pricing and its own tariff exposure. Fold both into one generic "framing" line item and you're guessing at half of it. We don't. Each side gets counted and priced on its own terms, then rolled into one number for your bid.
Why Lumber Market Timing Matters
Framing lumber is a commodity, not a fixed-price product. It's quoted by board footage (MBF, thousand board feet), and that price moves with the broader lumber market, on mill supply, transportation, and trade policy, and in a single quarter it moves by a real margin.
So a generic, months-old price sheet is a bad way to price a framing bid. An estimate built on stale numbers leaves real money on the table, or worse, puts a number in front of a client that doesn't hold once material actually gets ordered. Our 18 to 24 hour turnaround keeps the pricing behind your estimate current, not pulled from whatever the last job happened to cost.
We price against current material data every time, not a cached number from a few estimates ago. Fast and current beats fast and stale, every time it counts.
Every Piece We Count, From Sill Plate to Ridge Beam
A framing material takeoff isn't a square-footage guess. It's a piece count. Here's what actually shows up on the list.
Structural lumber or steel
Studs, plates, headers, joists, rafters, beams, and trusses, counted piece by piece off the drawings, not estimated from a per-square-foot average.
Fasteners and hardware
Clips, straps, hangers, and bolts, the connectors that turn loose lumber or steel into a structure that actually holds.
Sheathing
Wall and roof sheathing sized to the framing assembly, quantified separately from the framing members themselves.
Labor cost
Man-hours mapped to the framing method and priced to local wage rates, because a stick-built wood frame and a cold-formed steel assembly don't take the same crew the same amount of time.
We count every stud. Not a rough allowance of studs per linear foot, an actual count off your drawings. That's the difference between a number to bid with and a number to pad because you don't fully trust it.
How a Framing Takeoff Comes Together
Send your plans
Structural drawings, architectural set, or a framing plan specifically, upload it through the form above or call us if that's easier.
We confirm the framing method
Wood, metal, or a mix of both, and which CSI division each part of the job falls under. Questions come back fast if the drawings leave something ambiguous.
We run the piece count and price it
The piece count is built member by member, then priced against current material and labor data through RSMeans.
You get a bid-ready estimate
The piece count doesn't leave the office until somebody other than whoever ran it has looked at it. Studs to trusses, wood and steel broken out separately, delivered in 18 to 24 hours.
We built our process for speed, on purpose, because a framing bid that's still current when it lands on your desk is worth more than one that's technically "done" a day later.
Four Project Types, Two Framing Materials
A single-family stud wall, a mid-rise's cold-formed steel skeleton, an industrial building's mixed metal-and-wood assembly, and a public structure's steel truss work don't price the same way, so each one goes to an estimator who's already worked that exact scope.

Single-family and multifamily wood framing, priced by the piece.

Cold-formed steel and mixed assemblies, phased around occupancy.

Large-span metal framing and wood truss roofs, priced piece by piece.

Structural steel framing on public and infrastructure work, priced to the code the job carries.
The Tools and Codes Behind a Framing Number
Every framing takeoff we run goes through PlanSwift, Bluebeam, Stack or Accubid, whichever fits the project's format and scope, with RSMeans supplying the cost data. No proprietary software to learn, and no locked-in file format that traps your files.
Every framing estimate we produce is coded to its actual CSI division, Division 06 for wood and rough carpentry, Division 05 for cold-formed metal framing, so it drops straight into a larger bid package without anyone having to reclassify it later. That matters when a job mixes materials, since the framing package then spans two divisions.
Fee, Turnaround, and Where We Work
Flat fee
$100 to $5,000, depending on scope. No hourly surprises.
Turnaround
18 to 24 hours, wood or metal.
Accuracy
97%, tracked across completed projects.
Reply
Within 20 minutes during working hours.
Flat fee, $100 to $5,000 depending on scope, no hourly surprises. Turnaround runs 18 to 24 hours, wood or metal, and 97% accuracy is tracked across our completed projects, not a number we picked because it sounded good. Send us your plans and an estimator replies within 20 minutes during working hours.
We work all 50 states and every CSI trade, so if your framing package needs to sit alongside a concrete or roofing estimate for the same job, we run both without you managing two separate vendors. That's the whole point of working with an estimating partner who covers the full trade list, not just the one you called about.
Lumberyards, Framers, and the Steel Crews Between Them
Framing sits at an unusual spot in construction. It's not just contractors who need this number.
Lumberyards & wholesalers
Accurate takeoffs to quote material orders against, not a guess at what a job will actually need.
General & framing contractors
Plans sent in, labor and material bid together, one number to work from.
Carpenters & framers
A piece count to order material without over-buying or coming up short mid-job.
Steel manufacturers, fabricators & erectors
The metal-framing side of mixed projects, where the count has to match what actually gets fabricated, not a rough guess.
If you touch framing lumber or structural steel anywhere between the plan set and the finished wall, this is built for you.
Frequently Asked Questions
What's the difference between a wood framing estimate and a metal framing estimate?
+
Wood framing counts studs, plates, headers, joists, rafters, and trusses under CSI Division 06. Metal framing counts cold-formed steel studs, tracks, and connectors under Division 05. They price against different material markets and different labor rates, so we count and price each separately, then combine them into one estimate if your project uses both.
Do you handle projects that use both wood and metal framing?
+
Yes. Multifamily and mixed-use projects frame exterior walls in wood and interior partitions in cold-formed steel where the design calls for it. We price both sides of that split in one takeoff.
How do you estimate the cost of framing?
+
Count every member off the drawings, price the lumber or steel at current market, add the hardware and sheathing as their own lines, and map labor hours to the framing method at local wage rates. A per-square-foot rate gives a rough check, and the piece count is what a bid needs.
How fast does a framing estimate come back?
+
18 to 24 hours from when we receive your plans.
Does a framing estimate include hardware and connectors, or just lumber and studs?
+
Yes, both. Fastener and connector quantities, clips, straps, hangers, bolts, are counted alongside the structural members, since a framing package without hardware is an incomplete number.
Do you cover framing estimates in all 50 states?
+
Yes. We price labor to local rates regardless of where the project sits, and material pricing reflects current market conditions, not a flat national average.
What software do you use for framing takeoffs?
+
PlanSwift, Bluebeam and Accubid for the takeoff itself, Stack where it fits the project, RSMeans for the cost data.
Content reviewed and updated: November 4, 2026
Get Your Framing Estimate
Send your plans, wood, metal, or both, and get a piece-level takeoff and price back from Master Estimating in 18 to 24 hours. No account required, no obligation to move forward. Just a number to bid with.
Nothing to sign up front, and you're not billed unless the job actually goes ahead.