Fireproofing Estimating Services
Fireproofing estimating services price the material that protects a building's steel in a fire, and the firestopping that seals rated walls and floors, from a member-by-member takeoff against the Underwriters Laboratories (UL) design. Thickness changes member by member, so a rate per square foot does not survive contact with the drawings, and our fireproofing estimating services take it off the steel schedule, with cementitious and intumescent priced apart and firestopping on its own line.
The estimate returns in 18 to 24 hours from upload at 97% accuracy, tracked. Pricing is $100 to $5,000, flat fee per project, set by scope. Reply within 20 minutes during working hours.
- Thickness read against the listed UL design, member by member
- Exposed and concealed steel priced as two scopes, not blended
- A fireproofing estimator answers in 20 min
Every member priced by then
Held across every job we deliver
Applied fireproofing and firestopping
Before an estimator answers
Protecting the Frame, Sealing the Holes
Fireproofing estimating services are a full takeoff and price for the material that protects a building's structure during a fire, covering applied fireproofing and firestopping under Construction Specifications Institute (CSI) MasterFormat Division 07.
Two scopes, and they get mixed up constantly. One protects the frame so it holds its strength long enough for people to get out. The other seals the holes punched through rated walls and floors so the barrier keeps doing its job. Different specification sections, different test standards, different numbers on your bid.
Applied fireproofing (07 81 00)
Spray-applied fire-resistive material on beams, columns, joists and the underside of deck.
Intumescent coating
A thin film that swells into an insulating char when it gets hot, used where the steel stays in view.
Board and rigid encasement
Where a column needs a hard, clean finish rather than a sprayed one.
Firestopping (07 84 00)
Sealants, wraps, collars and mortar at every pipe, conduit, duct and cable that crosses a rated assembly.
Patching and repair
The go-back after other trades damage what was already sprayed.
What isn't ours: thermal insulation is a different scope with a different purpose, and it prices on an insulation estimate. Suppression systems put a fire out rather than buy the structure time, and those run through a fire protection estimate. Unsure which one your spec is asking for from the section numbers alone? Send the specification section and we'll sort that out before a single quantity gets counted.
A Heavier Beam Needs Less Protection
Here's the part that surprises people. The thickness of spray-applied fire-resistive material isn't printed on the drawings. It's calculated, member by member, and it runs backwards from what you'd guess.
Every steel member has a W/D ratio: its weight per foot divided by its heated perimeter in inches. That ratio goes into a published UL design, and the design gives you the thickness needed for the hourly rating the code calls for. The heavier the section, the more steel mass there is per unit of exposed surface, so the slower it heats, so the less material it needs. A big column takes a thinner coat than a light beam sitting right next to it.
There's a second wrinkle.
Beam carrying a floor
A beam carrying a floor is treated as exposed on three sides.
Column
A column is exposed on all four.
So two members that weigh exactly the same still need different thicknesses, purely because of how fire can reach them.
Which is why a rate per square foot tells you almost nothing. The quantity isn't an area, it's a sum of per-member calculations, and the schedule is required to do it. That's also why our estimators want the structural drawings rather than a floor plan. We're pricing what goes onto the frame, not the frame itself; if the steel package still needs a number, that's a structural steel estimate and a separate scope.
The Ceiling Plan Decides Which Material
Two materials hit the same hourly rating, and the thing that decides between them isn't fire safety at all. It's whether anybody is going to look at the steel.
| Material | Where it goes | Why it is chosen |
|---|---|---|
| Cementitious | Concealed steel: above ceilings, inside chases, behind soffits | Chosen where nobody has to look at the steel |
| Intumescent | Architecturally exposed structural steel in lobbies, atriums, open-ceiling spaces | A thin, paint-like finish, chosen where the steel stays in view |
| Board or rigid encasement | Columns in traffic areas needing a hard, impact-resistant face | Chosen where a hard, impact-resistant face matters |
So we let the reflected ceiling plan set this line, not the fire code. A single building carries both: cementitious everywhere the ceiling hides it, intumescent on the handful of members the architect left showing. That is why the two are priced as separate scopes.
The Penetrations Are a Separate Rating
Firestopping gets folded into fireproofing on bids. It shouldn't be, and the rating system is the reason.
Firestop systems are tested to UL 1479 and ASTM International (ASTM) E814, which are effectively the same test. Each system carries two numbers.
F-rating
The F-rating is how long it stops flame passing through.
T-rating
The T-rating is how long before the far side gets hot enough to ignite something touching it.
The T-rating is nearly always equal to or lower than the F, and where an assembly requires a T-rating, the lower number wins. A system with a two-hour F and a one-hour T does not work in a two-hour T location, no matter what the box says.
That's a detail that costs real money when it surfaces late, because the fix is a different system, installed twice. We quantify penetrations by type and by assembly, and we note where a T-rating applies, so the line is checked against what's actually specified.
What the Follow-On Trades Knock Off
Fireproofing is one of the only scopes on a job that gets damaged as a matter of routine, by the people who come after it.
The sprayer goes in early, right after the steel is up and before the deck gets loaded.
Then the hangers go in.
Then ductwork, sleeves, conduit, threaded rod, and every one of them either scrapes material off or needs it removed to make an attachment.
By the time ceilings close, a real percentage of what was applied has been knocked off or cut through, and somebody has to go back and repair it to keep the rating valid.
We price patching as its own line, because it's genuinely a second mobilization with its own labor and its own access problem, and because a rating that got compromised after the fact is a real inspection failure, not a cosmetic one.
We Start Where the Steel Is Listed
We pull the member schedule
Beams, columns, joists, sizes and lengths. Without it there's no honest quantity, only a guess dressed up as one.
We match members to their UL design
Each one gets its W/D ratio and the thickness that design requires for the rating on the drawings.
We split the scope by material and by exposure
Cementitious where the steel is hidden, intumescent where the ceiling plan leaves it showing, board where a hard face is called for.
We price application, access and patching separately
You see the spray, the reach, and the go-back as three different things instead of one blended rate.
Fireproofing Rarely Lands on One Contractor
Fireproofing scope has a habit of sitting between people, which is part of why it gets priced badly.
Fireproofing applicators
Bidding the work and wanting the quantities checked before they commit.
General contractors
Holding fireproofing inside a much bigger bid and wanting it shown as its own number.
Steel fabricators and erectors
Who need to know what's getting sprayed and when, because it sits in their sequence.
Drywall subcontractors
Where a rated assembly is the alternative route to the same rating.
Developers and building owners
Deciding what exposed steel is going to cost them before the design locks.
The rest of the package comes through the same desk when it is sent, which is what the wider estimating operation is there for.
Priced Against Published UL Designs
The takeoff happens in PlanSwift, Bluebeam and Accubid, worked off the structural set rather than a floor plan, with Stack for the odd project that arrives in something none of them will open. RSMeans carries the regional pricing.
On this trade though, the software is the smaller half of the job. The thickness figure comes out of a listed UL design, read against each member's W/D, and firestop systems come out of UL 1479 and ASTM E814 listings. That's reading, not measuring, and it's where a fireproofing number is won or lost.
Our estimators are aligned with the standards of the American Society of Professional Estimators (ASPE) and AACE International (AACE), and the finished takeoff carries CSI Division 07 coding so it slots into a bigger package as it stands. Want to spend a day inside the UL directory? Handing it to an estimating resource that already lives there is a fair call.
Billing Doesn't Follow the Fire Rating
$100 to $5,000, flat, and the hourly rating has nothing to do with where in that range you land. A three-hour rating doesn't cost more to estimate than a one-hour rating. What moves our fee is how much there is to price, not how demanding the code is about it.
Turnaround is 18 to 24 hours. The 97% accuracy figure is one we measure, job after job. Questions get answered inside 20 minutes during working hours, and on this trade the first one is about which members are exposed.
What you get back: a fireproofing takeoff listing members with their W/D and required thickness, quantities split by material, penetrations counted by type with ratings noted, patching carried separately, and the whole thing coded to Division 07. If you'd rather have quantities only and price them with your own rates, say so at upload.
The Rating Changes With the Occupancy
What the fire code demands moves with the building, and so does how much of the steel is visible. We price residential, commercial, and industrial fireproofing, plus the civil side.

Multi-family podium structures, party-wall assemblies, garages under occupied floors.

Offices, retail and healthcare, where the lobby steel is exposed and everything above the ceiling grid is not.

Plants and warehouses, long-span frames, the highest ratings and the hardest access.

Parking structures, transit and public buildings, where inspection is tighter and documentation matters as much as the material.
The Line Items a Square-Foot Price Hides
Thickness per member, not one average
Taken off the schedule against the UL design, the way the rating is actually achieved.
The exposed-steel split, priced honestly
Intumescent where the architect left it showing, cementitious where nobody will ever see it.
Firestopping on its own rated line
With the T-rating noted where an assembly requires one.
Patching after the follow-on trades
A second mobilization, counted as one.
Access counted as labor
Reaching a joist over a finished slab is not the same job as spraying at grade.
A number that survives inspection
Every quantity traceable to a member and a listed design.
Frequently Asked Questions
Why can't you just quote a rate per square foot?
+
Because the thickness isn't constant across the job. Each member gets a thickness set by its W/D ratio and the UL design for the required rating, so a heavy column and a light beam in the same bay need different amounts. A per-square-foot rate hides all of that and is wrong in both directions at once. Send the schedule and you'll get a real number instead.
Our lobby steel is staying exposed. How much does that change things?
+
Exposure changes the scope, and it's worth knowing early. Exposed members typically get an intumescent coating rather than a sprayed cementitious one, which is a different material and a different application. We price the exposed and concealed portions as two separate scopes rather than blending them, so the cost of the architectural decision is visible.
Is firestopping in the same number?
+
No, it is a separate line, always. Applied fireproofing protects the structure; firestopping seals penetrations through rated walls and floors, and it's tested and rated its own way under UL 1479 and ASTM E814. We'll quantify both if your scope has both, but they never share a line.
Which UL design do you price against?
+
Whichever one your spec names. We don't substitute a design we happen to know better, because the thickness table is specific to that listing and to the assembly it was tested in. Where the spec is silent, or the named design doesn't cover a condition on your job, we flag it rather than quietly picking something close.
Do you count the repair work after other trades damage it?
+
Yes, as its own line. Hangers, sleeves and rod work knock material off routinely, and the rating isn't valid until it's made good. Treating patching as a rounding error inside the spray rate is how this scope goes over.
How early can you give us a number?
+
Earlier than most people expect, as long as you accept what an early number is. We'll price off whatever exists and mark plainly which parts are assumptions. Fireproofing scope tightens up sharply the moment a real member schedule lands, so we'd rather price it twice than pretend a schematic set supports a firm figure.
Content reviewed and updated: November 4, 2026
Get Your Fireproofing Estimate
Send the structural drawings and the member schedule, and the reflected ceiling plan if exposure is in play. You'll get thickness taken off the UL designs member by member, cementitious and intumescent split apart, firestopping counted on its own rated line, and patching carried where it belongs.
Master Estimating covers all 50 states. Code adoption and inspection practice shift from one jurisdiction to the next, and that shift goes into the number. Back in 18 to 24 hours.