Most estimating websites describe a turnaround and a price and stop there, which tells you when something arrives and what it costs but nothing about what it is. This page is about the document itself: what is in it, how it is arranged, and which parts of it are the ones that save you an argument later.

Three Levels

Decide How Far You Want Us to Go

Depth you will not use is money spent for nothing, so the first decision is how far down the drawings you want us to go.

Quantities only

The measured takeoff with no pricing applied. Right when you have your own rates, your own subs and your own history, and what you actually lack is the hours to count it all off the drawings.

A priced estimate

The takeoff with material, labor and equipment costed against the rates your project's own market is paying. This is what most contractors order and what the rest of this page describes.

A full bid package

Everything in the priced version, plus the backup paperwork a formal submission has to carry with it. Right when the bid is formal, the owner is particular, or somebody downstream is going to interrogate the arithmetic.

You choose which one up front, since it changes the work and therefore the price of doing it. The fee itself runs $100 to $5,000, set by scope and fixed before anyone begins.

Anatomy

What the Document Is Made Of

Six parts. The first three are what everyone expects and the last three are where the value hides.

PartWhat sits in it, and why
Line itemsEvery measured item on its own row, not folded into a trade total. One is a number you can defend in a meeting; the other you can only read aloud.
The breakoutGrouped by system or CSI division, so a plumbing estimate separates water, waste, storm, gas and fixtures rather than arriving as one figure called plumbing.
Quantity and unitWhat was counted and what it was counted in, so you can spot-check any row against your own drawings.
Labor basisHours, not a percentage of material. A percentage hides the assumption; hours let you argue with it at your own crew rates.
Inclusions and exclusionsWhat we priced and, more importantly, what we did not. Anything the spec asks for that falls outside the package is named, so it cannot surface later as a surprise.
AssumptionsEvery judgment we made where a drawing would not commit. If one is wrong, you find out while you can still act on it.
The Two That Matter Most

Why the Exclusions Page Is the One to Read First

Nobody loses money on the rows that are present. They lose it on the row that is absent, that everyone assumed somebody else had priced, and that turns up as a change order once the job is running and the leverage has gone.

So the exclusions are not a disclaimer at the bottom of the file. They are a working document. Read against your own scope, they tell you exactly where the gaps between your packages are, which is information you can act on while you are still assembling the bid rather than after you have won it.

The assumptions work the same way. A drawing that will not say whether something is in or out forces a decision from whoever is pricing it. We make that decision, state it, and let you overrule it. The alternative, which is to make it quietly, is how two estimators produce two very different numbers off one identical set of drawings.

Format

However Your Bid Already Works

You get it asBest when
ExcelYou are dropping the figures into a bid sheet you already maintain, or you want to flex rates against your own history before submitting.
CSI MasterFormatThe owner or the GC wants divisions, or the estimate has to sit alongside other packages structured the same way.
PDFThe file is going to somebody who should read it rather than edit it.
A marked-up plan setYou want to see what was counted where, on the drawings themselves, rather than trusting a row in a spreadsheet.

Ask for more than one. There is no extra charge for the same estimate in a second format, and most contractors end up wanting the spreadsheet for themselves and the PDF for everyone else.

After Delivery

When the Scope Moves

Drawings change after an estimate is issued. That is normal and it is not a reason to start again.

Send the revision and we amend the affected rows rather than rebuilding the whole document, which keeps the parts you have already checked exactly where you left them. You can see what moved, which is the only version of a revision worth having.

Turnaround on the original is 18 to 24 hours from the point the scope is agreed, and an estimator replies to a revision the same way they reply to anything else, within 20 minutes in working hours.

Your Own

The Quickest Way to See One Is to Order One

A sample from somebody else's project tells you about the format. Your own drawings tell you about the number.

Send a set through the contact page and the scope and fee come back before any pricing happens, so you can see exactly what you would be buying and decline it at no cost if it is not what you wanted.